Semiconductor Advanced Packaging & Test calculator
Substrate Cost Calculator
Cost the substrate in each package once bad sites and tooling are counted. You need the strip price, sites per strip, substrate yield, tooling and NRE, packages built and a target cost.
What this calculator does
- Substrate cost per good package from strip price, sites per strip, substrate yield and tooling, with the strips to buy for the build.
Formula used
- Strips to buy = packages built ÷ (package sites per strip × substrate yield ÷ 100), rounded up
- Total substrate cost = strips to buy × substrate strip price + tooling and NRE
- Substrate cost per package = total substrate cost ÷ packages built; tooling and NRE per package = tooling and NRE ÷ packages built
- Cost of bad or unused sites = strips to buy × strip price − packages built × strip price ÷ package sites per strip
- Margin to target per package = target substrate cost per package − substrate cost per package
Inputs explained
- Substrate Strip Price: Price per substrate strip or panel on the supplier quote.
- Package Sites per Strip: Package positions on one strip, from the substrate drawing.
- Substrate Yield: Share of strip sites good at incoming inspection.
- Tooling and NRE: One-time substrate tooling and engineering charges for the build.
- Packages Built: Good packages the build must deliver.
- Target Substrate Cost per Package: The substrate cost your product costing allows per package.
How to use the result
- Best suited to quoting substrate cost for a new package, comparing substrate suppliers on yield, checking a short run's NRE burden.
- Does not price assembly losses on good substrate; those belong in the packaging yield.
Current U.S. benchmarks
- The producer price index for primary nonferrous metals (a broad metals benchmark, not copper alone) stands at 589.63 (BLS, Oct 2026), up 42.7% from a year earlier. Quotes priced off last quarter's material cost miss this move. Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026).
- The producer price index for plastic resins and materials stands at 283.88 (BLS, Oct 2026), up 9.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- The producer price index for paper (not a paperboard or container index) stands at 285.77 (BLS, Oct 2026), up 11.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- The U.S. has 11,261 computer and electronic products establishments employing about 815,443 workers (Census County Business Patterns, 2023).
Common questions
- Why does lower substrate yield raise the cost per package? Because bad sites come on the same strips you pay for. At 97% yield, 24 sites give 23.3 good packages a strip; at 70% only 16.8, so each good package carries more strip cost.
- Why round strips up? Substrate is bought by the strip, so a build needing 2,147.8 strips buys 2,148. The rounding waste shows in the bad or unused sites row.
- How should tooling and NRE be spread? Over the packages that use the tooling. A short run carries all of it, which is why the NRE per package row matters for prototypes and low volumes.
- Where does substrate yield come from? From incoming inspection or the supplier's map of good and bad sites on each strip: good sites ÷ total sites, the first-pass yield definition.
Last reviewed 2026-11-12.