Surgical Robotics Manufacturing calculator
Warranty Cost Calculator
Find the warranty cost to expect for your covered install base this year. You need the systems under warranty, the cost per claim, the expected claim rate and the recall reserve.
What this calculator does
- Expected yearly warranty cost for the covered install base, from the claim rate and cost per claim plus a recall reserve.
Formula used
- Expected claim cost ($) = systems under warranty × cost to resolve one claim × expected annual claim rate ÷ 100
- Expected warranty cost ($) = expected claim cost + recall and safety bulletin reserve
- Warranty cost per covered system = expected warranty cost ÷ systems under warranty
Inputs explained
- Systems Under Warranty: Surgical systems in the covered install base.
- Cost to Resolve One Claim: Average parts, labor and travel for one claim.
- Expected Annual Claim Rate: Share of covered systems expected to claim in the year.
- Recall and Safety Bulletin Reserve: Reserve for a field action or safety bulletin.
How to use the result
- Best suited to setting the warranty provision, pricing an extended warranty.
- Does not model extended warranty revenue. Ignores claims carried over from last year.
Current U.S. benchmarks
- U.S. manufacturing runs at 76.1% of capacity with new factory orders at $677B per month (Federal Reserve and Census, Sep 2026).
- Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026), up 44.8% in a year, and U.S. industrial electricity averages 9.64 cents per kWh. Both feed electrified-hardware unit economics.
- The U.S. has 8,825 medical equipment and supplies establishments employing about 308,388 workers (Census County Business Patterns, 2023).
Common questions
- What is the expected annual claim rate? The share of covered systems expected to raise a warranty claim in the year, from your field history. The 35% default is an example only.
- What goes into the cost per claim? Parts, technician labor, travel and any loaner or downtime credit paid to the hospital.
- Why hold a recall reserve? A field action or safety bulletin hits every covered system at once. The reserve is a provision for that event, not a forecast of it.
- Does the result include out-of-warranty service? No. Service for systems past warranty is budgeted in the field service reserve.
Last reviewed 2026-10-28.