Pressure converter

Convert Atmospheres to Psi (atm to psi)

1 atm = 14.6959 psi. Vacuum and process pressures referenced to atmosphere.

Atmospheres to psi conversion table

atmpsi
1 atm14.6959 psi
2 atm29.3919 psi
3 atm44.0878 psi
4 atm58.7838 psi
5 atm73.4797 psi
6 atm88.1757 psi
7 atm102.872 psi
8 atm117.568 psi
9 atm132.264 psi
10 atm146.959 psi
15 atm220.439 psi
20 atm293.919 psi
25 atm367.399 psi
30 atm440.878 psi
40 atm587.838 psi
50 atm734.797 psi
75 atm1102.2 psi
100 atm1469.59 psi
150 atm2204.39 psi
200 atm2939.19 psi
250 atm3673.99 psi
500 atm7347.97 psi
1000 atm14695.95 psi

How to convert atmospheres to psi

Multiply the value in atmospheres by 14.6959 to get psi. 1 atm equals 14.6959 psi, and 1 psi equals 0.068046 atm.

About these units

One standard atmosphere is the mean sea-level air pressure, defined as 101.325 kilopascals or about 14.7 psi. Vacuum and process engineering reference it as a baseline.

Pounds per square inch is the standard US pressure unit for compressed air, hydraulics, and tire and vessel ratings. Shop air systems typically run 90 to 125 psi.

Common questions

How many psi are in an atmosphere?

1 atm equals 14.6959 psi.

How do you convert atmospheres to psi?

Use psi ≈ atm × 14.6959. So 1 atm = 14.6959 psi, and to go back, 1 psi = 0.068046 atm.

What is 10 atm in psi?

10 atm equals 146.959 psi.

What is 100 atm in psi?

100 atm equals 1469.59 psi.

Convert psi to atm or browse all converters.

Download this conversion table as CSV.