Temperature converter

Convert Celsius to Fahrenheit (C to F)

1 C = 33.8 F. Process, mold, and melt temperatures across scales.

Celsius to Fahrenheit conversion table

CF
0 C32 F
20 C68 F
100 C212 F
150 C302 F
200 C392 F
250 C482 F
300 C572 F

How to convert Celsius to Fahrenheit

Temperature conversion uses a formula: F = C × 9/5 + 32. 1 C equals 33.8 F, and 1 F equals -17.2222 C.

About these units

The Celsius scale sets water freezing at 0 and boiling at 100 degrees at standard pressure. Process, mold, and oven temperatures worldwide are set in Celsius.

The Fahrenheit scale sets water freezing at 32 and boiling at 212 degrees. US process equipment, ovens, and HVAC setpoints read in Fahrenheit.

Common questions

What is 100 C in F?

100 C equals 212 F, using F = C × 9/5 + 32.

How do you convert Celsius to Fahrenheit?

Use F = C × 9/5 + 32. Temperature scales start from different zero points, so no single multiplier converts them; the formula includes an offset.

Convert F to C or browse all converters.

Download this conversion table as CSV.