Flow Rate converter

Convert Cubic Meters per Hour to Cubic Feet per Minute (m3/h to CFM)

1 m3/h = 0.588578 CFM. Compressed air and ventilation sizing.

Cubic meters per hour to cubic feet per minute conversion table

m3/hCFM
1 m3/h0.588578 CFM
2 m3/h1.1772 CFM
3 m3/h1.7657 CFM
4 m3/h2.3543 CFM
5 m3/h2.9429 CFM
6 m3/h3.5315 CFM
7 m3/h4.12 CFM
8 m3/h4.7086 CFM
9 m3/h5.2972 CFM
10 m3/h5.8858 CFM
15 m3/h8.8287 CFM
20 m3/h11.7716 CFM
25 m3/h14.7144 CFM
30 m3/h17.6573 CFM
40 m3/h23.5431 CFM
50 m3/h29.4289 CFM
75 m3/h44.1433 CFM
100 m3/h58.8578 CFM
150 m3/h88.2867 CFM
200 m3/h117.716 CFM
250 m3/h147.144 CFM
500 m3/h294.289 CFM
1000 m3/h588.578 CFM

How to convert cubic meters per hour to cubic feet per minute

Multiply the value in cubic meters per hour by 0.588578 to get cubic feet per minute. 1 m3/h equals 0.588578 CFM, and 1 CFM equals 1.699 m3/h.

About these units

Cubic meters per hour is the metric unit for larger air and liquid flows, common on fan, blower, and process equipment datasheets in Europe.

Cubic feet per minute is the US unit for airflow in compressed air, ventilation, and dust collection. Compressor capacity is quoted in CFM at a stated pressure.

Common questions

How many cubic feet per minute are in a cubic meter per hour?

1 m3/h equals 0.588578 CFM.

How do you convert cubic meters per hour to cubic feet per minute?

Use CFM ≈ m3/h × 0.588578. So 1 m3/h = 0.588578 CFM, and to go back, 1 CFM = 1.699 m3/h.

What is 10 m3/h in CFM?

10 m3/h equals 5.8858 CFM.

What is 100 m3/h in CFM?

100 m3/h equals 58.8578 CFM.

Convert CFM to m3/h or browse all converters.

Download this conversion table as CSV.