Length converter

Convert Feet to Meters (ft to m)

1 ft = 0.3048 m. Layout, conveyor runs, and facility dimensions.

Feet to meters conversion table

ftm
1 ft0.3048 m
2 ft0.6096 m
3 ft0.9144 m
4 ft1.2192 m
5 ft1.524 m
6 ft1.8288 m
7 ft2.1336 m
8 ft2.4384 m
9 ft2.7432 m
10 ft3.048 m
15 ft4.572 m
20 ft6.096 m
25 ft7.62 m
30 ft9.144 m
40 ft12.192 m
50 ft15.24 m
75 ft22.86 m
100 ft30.48 m
150 ft45.72 m
200 ft60.96 m
250 ft76.2 m
500 ft152.4 m
1000 ft304.8 m

How to convert feet to meters

Multiply the value in feet by 0.3048 to get meters. 1 ft equals 0.3048 m, and 1 m equals 3.2808 ft.

About these units

The foot equals 12 inches or exactly 0.3048 meters. Plant layouts, rack spacing, and building dimensions in the US are drawn in feet and inches.

The meter is the SI base unit of length, used for facility layouts, conveyor runs, coil and web lengths, and material ordering.

Common questions

How many meters are in a foot?

1 ft equals 0.3048 m.

How do you convert feet to meters?

Use m = ft × 0.3048. So 1 ft = 0.3048 m, and to go back, 1 m = 3.2808 ft.

What is 10 ft in m?

10 ft equals 3.048 m.

What is 100 ft in m?

100 ft equals 30.48 m.

Convert m to ft or browse all converters.

Download this conversion table as CSV.