Mass converter
Convert Grams to Ounces (g to oz)
1 g = 0.035274 oz. Shot weights, samples, and small-part mass.
Grams to ounces conversion table
| g | oz |
|---|---|
| 1 g | 0.035274 oz |
| 2 g | 0.070548 oz |
| 3 g | 0.105822 oz |
| 4 g | 0.141096 oz |
| 5 g | 0.17637 oz |
| 6 g | 0.211644 oz |
| 7 g | 0.246918 oz |
| 8 g | 0.282192 oz |
| 9 g | 0.317466 oz |
| 10 g | 0.35274 oz |
| 15 g | 0.529109 oz |
| 20 g | 0.705479 oz |
| 25 g | 0.881849 oz |
| 30 g | 1.0582 oz |
| 40 g | 1.411 oz |
| 50 g | 1.7637 oz |
| 75 g | 2.6455 oz |
| 100 g | 3.5274 oz |
| 150 g | 5.2911 oz |
| 200 g | 7.0548 oz |
| 250 g | 8.8185 oz |
| 500 g | 17.637 oz |
| 1000 g | 35.274 oz |
How to convert grams to ounces
Multiply the value in grams by 0.035274 to get ounces. 1 g equals 0.035274 oz, and 1 oz equals 28.3495 g.
About these units
The gram is one thousandth of a kilogram. Shot weights in molding, adhesive deposits, and small-part masses are tracked in grams.
The ounce is one sixteenth of a pound, about 28.35 grams. Coating deposits and small consumable quantities appear in ounces in US usage.
Common questions
How many ounces are in a gram?
1 g equals 0.035274 oz.
How do you convert grams to ounces?
Use oz ≈ g × 0.035274. So 1 g = 0.035274 oz, and to go back, 1 oz = 28.3495 g.
What is 10 g in oz?
10 g equals 0.35274 oz.
What is 100 g in oz?
100 g equals 3.5274 oz.