Length converter

Convert Inches to Centimeters (in to cm)

1 in = 2.54 cm. Quick shop-floor conversions between metric and imperial rules.

Inches to centimeters conversion table

incm
1 in2.54 cm
2 in5.08 cm
3 in7.62 cm
4 in10.16 cm
5 in12.7 cm
6 in15.24 cm
7 in17.78 cm
8 in20.32 cm
9 in22.86 cm
10 in25.4 cm
15 in38.1 cm
20 in50.8 cm
25 in63.5 cm
30 in76.2 cm
40 in101.6 cm
50 in127 cm
75 in190.5 cm
100 in254 cm
150 in381 cm
200 in508 cm
250 in635 cm
500 in1270 cm
1000 in2540 cm

How to convert inches to centimeters

Multiply the value in inches by 2.54 to get centimeters. 1 in equals 2.54 cm, and 1 cm equals 0.393701 in.

About these units

The inch is the base dimension unit on US engineering drawings, defined exactly as 25.4 millimeters. Shop tolerances are usually expressed in decimal inches rather than fractions.

The centimeter is one hundredth of a meter. It is common in consumer specifications but rare on engineering drawings, which prefer millimeters to avoid decimal-place mistakes.

Common questions

How many centimeters are in an inch?

1 in equals 2.54 cm.

How do you convert inches to centimeters?

Use cm = in × 2.54. So 1 in = 2.54 cm, and to go back, 1 cm = 0.393701 in.

What is 10 in in cm?

10 in equals 25.4 cm.

What is 100 in in cm?

100 in equals 254 cm.

Convert cm to in or browse all converters.

Download this conversion table as CSV.