Mass converter
Convert Kilograms to Pounds (kg to lb)
1 kg = 2.2046 lb. Part weights, material orders, and load ratings.
Kilograms to pounds conversion table
| kg | lb |
|---|---|
| 1 kg | 2.2046 lb |
| 2 kg | 4.4092 lb |
| 3 kg | 6.6139 lb |
| 4 kg | 8.8185 lb |
| 5 kg | 11.0231 lb |
| 6 kg | 13.2277 lb |
| 7 kg | 15.4324 lb |
| 8 kg | 17.637 lb |
| 9 kg | 19.8416 lb |
| 10 kg | 22.0462 lb |
| 15 kg | 33.0693 lb |
| 20 kg | 44.0925 lb |
| 25 kg | 55.1156 lb |
| 30 kg | 66.1387 lb |
| 40 kg | 88.1849 lb |
| 50 kg | 110.231 lb |
| 75 kg | 165.347 lb |
| 100 kg | 220.462 lb |
| 150 kg | 330.693 lb |
| 200 kg | 440.925 lb |
| 250 kg | 551.156 lb |
| 500 kg | 1102.31 lb |
| 1000 kg | 2204.62 lb |
How to convert kilograms to pounds
Multiply the value in kilograms by 2.2046 to get pounds. 1 kg equals 2.2046 lb, and 1 lb equals 0.453592 kg.
About these units
The kilogram is the SI base unit of mass. Material is bought, batched, and costed per kilogram across metric supply chains.
The pound (avoirdupois) is defined as exactly 0.45359237 kilograms. US material pricing, shipping weights, and load ratings are quoted in pounds.
Common questions
How many pounds are in a kilogram?
1 kg equals 2.2046 lb.
How do you convert kilograms to pounds?
Use lb ≈ kg × 2.20462. So 1 kg = 2.2046 lb, and to go back, 1 lb = 0.453592 kg.
What is 10 kg in lb?
10 kg equals 22.0462 lb.
What is 100 kg in lb?
100 kg equals 220.462 lb.