Force converter

Convert Pounds-Force to Kilonewtons (lbf to kN)

1 lbf = 0.004448 kN. Press tonnage and stamping forces.

Pounds-force to kilonewtons conversion table

lbfkN
1 lbf0.004448 kN
2 lbf0.008896 kN
3 lbf0.013345 kN
4 lbf0.017793 kN
5 lbf0.022241 kN
6 lbf0.026689 kN
7 lbf0.031138 kN
8 lbf0.035586 kN
9 lbf0.040034 kN
10 lbf0.044482 kN
15 lbf0.066723 kN
20 lbf0.088964 kN
25 lbf0.111206 kN
30 lbf0.133447 kN
40 lbf0.177929 kN
50 lbf0.222411 kN
75 lbf0.333617 kN
100 lbf0.444822 kN
150 lbf0.667233 kN
200 lbf0.889644 kN
250 lbf1.1121 kN
500 lbf2.2241 kN
1000 lbf4.4482 kN

How to convert pounds-force to kilonewtons

Multiply the value in pounds-force by 0.004448 to get kilonewtons. 1 lbf equals 0.004448 kN, and 1 kN equals 224.809 lbf.

About these units

The pound-force is the US customary force unit, the weight of one pound of mass under standard gravity. Press and clamp ratings in the US are quoted in pounds-force or tons.

The kilonewton is 1,000 newtons, roughly 225 pounds-force. Press tonnage, structural loads, and fastener proof loads are commonly given in kilonewtons.

Common questions

How many kilonewtons are in a pound-force?

1 lbf equals 0.004448 kN.

How do you convert pounds-force to kilonewtons?

Use kN ≈ lbf × 0.00444822. So 1 lbf = 0.004448 kN, and to go back, 1 kN = 224.809 lbf.

What is 10 lbf in kN?

10 lbf equals 0.044482 kN.

What is 100 lbf in kN?

100 lbf equals 0.444822 kN.

Convert kN to lbf or browse all converters.

Download this conversion table as CSV.