Pressure converter

Convert Psi to Megapascals (psi to MPa)

1 psi = 0.006895 MPa. Material yield and tensile strength between MPa and psi.

Psi to megapascals conversion table

psiMPa
1 psi0.006895 MPa
2 psi0.01379 MPa
3 psi0.020684 MPa
4 psi0.027579 MPa
5 psi0.034474 MPa
6 psi0.041369 MPa
7 psi0.048263 MPa
8 psi0.055158 MPa
9 psi0.062053 MPa
10 psi0.068948 MPa
15 psi0.103421 MPa
20 psi0.137895 MPa
25 psi0.172369 MPa
30 psi0.206843 MPa
40 psi0.27579 MPa
50 psi0.344738 MPa
75 psi0.517107 MPa
100 psi0.689476 MPa
150 psi1.0342 MPa
200 psi1.379 MPa
250 psi1.7237 MPa
500 psi3.4474 MPa
1000 psi6.8948 MPa

How to convert psi to megapascals

Multiply the value in psi by 0.006895 to get megapascals. 1 psi equals 0.006895 MPa, and 1 MPa equals 145.038 psi.

About these units

Pounds per square inch is the standard US pressure unit for compressed air, hydraulics, and tire and vessel ratings. Shop air systems typically run 90 to 125 psi.

The megapascal equals one million pascals, or one newton per square millimeter. Material strengths such as yield and tensile are published in megapascals.

Common questions

How many megapascals are in a psi?

1 psi equals 0.006895 MPa.

How do you convert psi to megapascals?

Use MPa ≈ psi × 0.00689476. So 1 psi = 0.006895 MPa, and to go back, 1 MPa = 145.038 psi.

What is 10 psi in MPa?

10 psi equals 0.068948 MPa.

What is 100 psi in MPa?

100 psi equals 0.689476 MPa.

Convert MPa to psi or browse all converters.

Download this conversion table as CSV.