Length converter

Convert Thousandths of an Inch to Microns (thou to um)

1 thou = 25.4 um. Surface finish and film thickness specs across unit systems.

Thousandths of an inch to microns conversion table

thouum
1 thou25.4 um
2 thou50.8 um
3 thou76.2 um
4 thou101.6 um
5 thou127 um
6 thou152.4 um
7 thou177.8 um
8 thou203.2 um
9 thou228.6 um
10 thou254 um
15 thou381 um
20 thou508 um
25 thou635 um
30 thou762 um
40 thou1016 um
50 thou1270 um
75 thou1905 um
100 thou2540 um
150 thou3810 um
200 thou5080 um
250 thou6350 um
500 thou12700 um
1000 thou25400 um

How to convert thousandths of an inch to microns

Multiply the value in thousandths of an inch by 25.4 to get microns. 1 thou equals 25.4 um, and 1 um equals 0.03937 thou.

About these units

A thou (or mil) is one thousandth of an inch, written 0.001 in. Machinists quote fits, shim sizes, and coating thicknesses in thou.

The micron (micrometer) is one millionth of a meter. Surface finish, plating thickness, filtration ratings, and semiconductor features are specified in microns.

Common questions

How many microns are in a thousandth of an inch?

1 thou equals 25.4 um.

How do you convert thousandths of an inch to microns?

Use um = thou × 25.4. So 1 thou = 25.4 um, and to go back, 1 um = 0.03937 thou.

What is 10 thou in um?

10 thou equals 254 um.

What is 100 thou in um?

100 thou equals 2540 um.

Convert um to thou or browse all converters.

Download this conversion table as CSV.