Length converter

Convert Thousandths of an Inch to Millimeters (thou to mm)

1 thou = 0.0254 mm. Tolerances and coating thickness, where a thou is 0.001 inch.

Thousandths of an inch to millimeters conversion table

thoumm
0.5 thou0.0127 mm
1 thou0.0254 mm
1.5 thou0.0381 mm
2 thou0.0508 mm
2.5 thou0.0635 mm
3 thou0.0762 mm
4 thou0.1016 mm
5 thou0.127 mm
6 thou0.1524 mm
7 thou0.1778 mm
8 thou0.2032 mm
9 thou0.2286 mm
10 thou0.254 mm
12 thou0.3048 mm
15 thou0.381 mm
18 thou0.4572 mm
20 thou0.508 mm
25 thou0.635 mm
30 thou0.762 mm
35 thou0.889 mm
40 thou1.016 mm
45 thou1.143 mm
50 thou1.27 mm
60 thou1.524 mm
62.5 thou1.5875 mm
70 thou1.778 mm
75 thou1.905 mm
80 thou2.032 mm
90 thou2.286 mm
100 thou2.54 mm
125 thou3.175 mm
150 thou3.81 mm
187.5 thou4.7625 mm
200 thou5.08 mm
250 thou6.35 mm
375 thou9.525 mm
500 thou12.7 mm
750 thou19.05 mm
1000 thou25.4 mm

How to convert thousandths of an inch to millimeters

Multiply the value in thousandths of an inch by 0.0254 to get millimeters. 1 thou equals 0.0254 mm, and 1 mm equals 39.3701 thou.

About these units

A thou (or mil) is one thousandth of an inch, written 0.001 in. Machinists quote fits, shim sizes, and coating thicknesses in thou.

The millimeter is one thousandth of a meter and the default dimension unit on metric engineering drawings. Machined tolerances are commonly quoted in hundredths of a millimeter.

Common questions

How many millimeters are in a thousandth of an inch?

1 thou equals 0.0254 mm.

How do you convert thousandths of an inch to millimeters?

Use mm = thou × 0.0254. So 1 thou = 0.0254 mm, and to go back, 1 mm = 39.3701 thou.

What is 5 thou in mm?

5 thou equals 0.127 mm.

What is 10 thou in mm?

10 thou equals 0.254 mm.

What is 20 thou in mm?

20 thou equals 0.508 mm.

Convert mm to thou or browse all converters.

Download this conversion table as CSV.