Rhode Island energy profile
Manufacturing energy costs in Rhode Island
The current industrial power rate in Rhode Island is 19.87 cents per kWh (Aug 2026, EIA), ranking 47 of 51 (50 states and DC) and sitting 106.1% above the national average.
Current prices in Rhode Island
- Industrial electricity: 19.87 cents per kWh (Aug 2026, EIA).
- Commercial electricity, the rate a warehouse or distribution center in Rhode Island typically pays: 23.31 cents per kWh.
- Industrial natural gas: $9.41 per Mcf (Aug 2026), 116.8% above the national average.
- Just below Rhode Island on the price ladder: New Jersey at 16.24, New Hampshire at 17.26, District of Columbia at 18.53 cents. Just above: Massachusetts at 20.03, Alaska at 23.13, California at 24.12 cents.
What the rate does to operating cost
- A 10 kW machine running a 4,000 hour year costs about $7,948 in electricity at Rhode Island rates versus $3,856 at the national average; at 50 kW the gap is $39,740 versus $19,280, and at 200 kW it is $158,960 versus $77,120.
- Power costs here punish waste. In Rhode Island, load-shifting, waste heat recovery, and idle-time elimination pay back quicker than the national math suggests, and quotes for energy-heavy work should use the local rate, not a national default.
Cost to manufacture in Rhode Island
- Rhode Island scores 113.3 on the MFG Calcs State Cost-to-Manufacture Index, where the U.S. is 100: the 40th lowest of 51 (electricity averaged over the 12 months to Aug 2026, wages from the 2025 survey).
- Its labor factor (manufacturing wages) is 102.2 and its energy factor (industrial electricity) 241.5; the index weighs wages at 92% and electricity at 8%, their shares of what manufacturers spend on labor and purchased energy, and leaves out taxes, land and incentives.
What factory labor pays in Rhode Island
- Industrial production managers: $59.67/hr median in Rhode Island versus $60.61 nationally (OEWS 2025).
- Industrial engineers: $52.57/hr median in Rhode Island versus $49.25 nationally (OEWS 2025).
- Production supervisors: $39.25/hr median in Rhode Island versus $35.79 nationally (OEWS 2025).
- Industrial machinery mechanics: $31.14/hr median in Rhode Island versus $31.02 nationally (OEWS 2025).
- Tool and die makers: $30.49/hr median in Rhode Island versus $30.79 nationally (OEWS 2025).
- Machinists: $27.77/hr median in Rhode Island versus $28.24 nationally (OEWS 2025).
Manufacturing jobs in Rhode Island
- Rhode Island had 40,500 manufacturing jobs in Oct 2026, the 42nd most of 51 (BLS State and Metro Area Employment, not seasonally adjusted).
- That is up 3.6% from Oct 2025.
Manufacturing base in Rhode Island
- Rhode Island has 1,188 manufacturing establishments employing about 40,210 workers (Census County Business Patterns, 2023).
- Average pay per manufacturing employee is $70,230, 4% below the U.S. average of $73,202.
- Largest sectors by establishment count: fabricated metal products (219), food manufacturing (141), printing and related support (93), machinery manufacturing (76), chemical manufacturing (69).
Manufacturing economy in Rhode Island
- Manufacturing added $6.2B to Rhode Island's economy in 2025, 7% of the state's GDP, the 43rd largest of the 50 states and DC (BEA).
Sources and update cadence
- Prices come from the U.S. Energy Information Administration, jobs from the Bureau of Labor Statistics, establishments and payroll from the Census Bureau and GDP from the Bureau of Economic Analysis; each refreshes automatically when the agency publishes, and this page archives every month and year it shows so the Rhode Island history keeps deepening.
Last reviewed 2026-11-20.