HTS Heading 1003

Barley

All 4 HTS codes under heading 1003 (barley), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 1003

  • 1003 Barley.
  • 1003.10.00.00 Seed (under: Barley) (kg): General 0.15¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 0.92¢/kg.
  • 1003.90 Other (under: Barley).
  • 1003.90.20.00 For malting purposes (under: Other) (kg): General 0.1¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 0.92¢/kg.
  • 1003.90.40 Other (under: Other): General 0.15¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 0.92¢/kg.
  • 1003.90.40.20 Certified organic (under: Other) (kg).
  • 1003.90.40.30 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.