HTS Heading 1208

Flours and meals of oil seeds or oleaginous fruits, other than those of mustard

All 3 HTS codes under heading 1208 (flours and meals of oil seeds), with their duty rates from the 2026 HTS Revision 23. General duty 1.4% to 1.9%.

Every line of heading 1208

  • 1208 Flours and meals of oil seeds or oleaginous fruits, other than those of mustard.
  • 1208.10.00 Of soybeans (under: Flours and meals of oil seeds or oleaginous fruits, other than those of mustard): General 1.9%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 20%.
  • 1208.10.00.10 Certified organic (under: Of soybeans) (kg).
  • 1208.10.00.90 Other (under: Of soybeans) (kg).
  • 1208.90.00.00 Other (under: Flours and meals of oil seeds or oleaginous fruits, other than those of mustard) (kg): General 1.4%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 20%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.