HTS Heading 1521
Vegetable waxes (other than triglycerides), beeswax, other insect waxes and spermaceti, whether or not refined or colored
All 5 HTS codes under heading 1521 (vegetable waxes), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.8%.
Every line of heading 1521
- 1521 Vegetable waxes (other than triglycerides), beeswax, other insect waxes and spermaceti, whether or not refined or colored.
- 1521.10.00 Vegetable waxes (under: Vegetable waxes (other than triglycerides), beeswax, other insect waxes and spermaceti, whether or not refined or colored): General Free; Special none; Column 2 Free.
- 1521.10.00.20 Candelilla (under: Vegetable waxes) (kg).
- 1521.10.00.40 Carnauba (under: Vegetable waxes) (kg).
- 1521.10.00.60 Other (under: Vegetable waxes) (kg).
- 1521.90 Other (under: Vegetable waxes (other than triglycerides), beeswax, other insect waxes and spermaceti, whether or not refined or colored).
- 1521.90.20.00 Bleached beeswax (under: Other) (kg): General 4.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 1521.90.40.00 Other (under: Other) (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.