HTS Heading 1601
Sausages and similar products, of meat, meat offal, blood or insects; food preparations based on these products
All 7 HTS codes under heading 1601 (sausages and similar), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.4%, some per unit.
Every line of heading 1601
- 1601.00 Sausages and similar products, of meat, meat offal, blood or insects; food preparations based on these products.
- 1601.00.20 Pork (under: Sausages and similar products, of meat, meat offal, blood or insects; food preparations based on these products): General 0.8¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.2¢/kg.
- 1601.00.20.10 Canned (under: Pork) (kg).
- 1601.00.20.90 Other (under: Pork) (kg).
- 1601.00.40 Beef in airtight containers (under: Other): General 3.4%; Special Free (A,AU,BH,CL,CO,D,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 1601.00.40.10 Canned (under: Beef in airtight containers) (kg).
- 1601.00.40.90 Other (under: Beef in airtight containers) (kg).
- 1601.00.60 Other (under: Other): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 1601.00.60.20 Beef (under: Other) (kg).
- 1601.00.60.60 Canned (under: Other) (kg).
- 1601.00.60.80 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.