HTS Heading 1703
Molasses resulting from the extraction or refining of sugar
All 4 HTS codes under heading 1703 (molasses resulting from), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 1703
- 1703 Molasses resulting from the extraction or refining of sugar.
- 1703.10 Cane molasses (under: Molasses resulting from the extraction or refining of sugar).
- 1703.10.30.00 Imported for (a) the commercial extraction of sugar or (b) human consumption (liters): General 0.35¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.8¢/liter.
- 1703.10.50.00 Other (under: Cane molasses) (liters, kg ttl sug): General 0.01¢/kg of total sugars; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 0.07¢/kg of total sugars.
- 1703.90 Other (under: Molasses resulting from the extraction or refining of sugar).
- 1703.90.30.00 Imported for (a) the commercial extraction of sugar or (b) human consumption (liters): General 0.35¢/liter; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.8¢/liter.
- 1703.90.50.00 Other (under: Other) (liters, kg ttl sug): General 0.01¢/kg of total sugars; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 0.07¢/kg of total sugars.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.