HTS Heading 2308
Vegetable materials and vegetable waste, vegetable residues and byproducts, whether or not in the form of pellets, of a kind used in animal feeding, not elsewhere specified or included
All 5 HTS codes under heading 2308 (vegetable materials and vegetable waste), with their duty rates from the 2026 HTS Revision 23. General duty Free to 1.9%.
Every line of heading 2308
- 2308.00 Vegetable materials and vegetable waste, vegetable residues and byproducts, whether or not in the form of pellets, of a kind used in animal feeding, not elsewhere specified or included.
- 2308.00.10.00 Acorns and horse-chestnuts (under: Vegetable materials and vegetable waste, vegetable residues and byproducts, whether or not in the form of pellets, of a kind used in animal feeding, not elsewhere specified or included) (kg): General 1.4%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 20%.
- 2308.00.93.00 Screenings, scalpings, chaff or scourings, ground, or not ground, of flaxseed (linseed) (kg): General Free; Special none; Column 2 10%.
- 2308.00.95.00 Dehydrated marigolds (under: Vegetable materials and vegetable waste, vegetable residues and byproducts, whether or not in the form of pellets, of a kind used in animal feeding, not elsewhere specified or included) (kg): General 1.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 2308.00.98 Other (under: Vegetable materials and vegetable waste, vegetable residues and byproducts, whether or not in the form of pellets, of a kind used in animal feeding, not elsewhere specified or included): General 1.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 20%.
- 2308.00.98.20 Citrus pulp pellets (under: Other) (t).
- 2308.00.98.90 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.