HTS Heading 2401
Unmanufactured tobacco (whether or not threshed or similarly processed); tobacco refuse
All 137 HTS codes under heading 2401 (unmanufactured tobacco), with their duty rates from the 2026 HTS Revision 23. General duty Free to 350%, some per unit.
Every line of heading 2401
- 2401 Unmanufactured tobacco (whether or not threshed or similarly processed); tobacco refuse.
- 2401.10 Tobacco, not stemmed/stripped.
- 2401.10.21 Wrapper tobacco (under: Containing over 35 percent wrapper tobacco): General Free; Special none; Column 2 $5.02/kg.
- 2401.10.21.20 Connecticut shade (under: Wrapper tobacco) (kg).
- 2401.10.21.40 Other (under: Wrapper tobacco) (kg).
- 2401.10.29 Other (under: Containing over 35 percent wrapper tobacco): General Free; Special none; Column 2 $5.02/kg.
- 2401.10.29.20 Connecticut shade (under: Other) (kg).
- 2401.10.29.40 Other (under: Other) (kg).
- 2401.10.44.00 Cigarette leaf (under: Oriental or Turkish type) (kg): General Free; Special none; Column 2 77.2¢/kg.
- 2401.10.48.00 Other (under: Oriental or Turkish type) (kg): General Free; Special none; Column 2 85¢/kg.
- 2401.10.53 Cigar binder and filler (under: Not containing wrapper tobacco, or not containing over 35 percent wrapper tobacco): General Free; Special none; Column 2 85¢/kg.
- 2401.10.53.40 Binder (under: Cigar binder and filler) (kg).
- 2401.10.53.50 Filler (under: Cigar binder and filler) (kg).
- 2401.10.61 To be used in products other than cigarettes: General 23.9¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG); Column 2 77.2¢/kg.
- 2401.10.61.30 Flue-cured (under: To be used in products other than cigarettes) (kg).
- 2401.10.61.60 Burley (under: To be used in products other than cigarettes) (kg).
- 2401.10.61.80 Maryland (under: To be used in products other than cigarettes) (kg).
- 2401.10.61.90 Other (under: To be used in products other than cigarettes) (kg).
- 2401.10.63 Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions: General 23.9¢/kg; Special Free (A+,BH,CL,CO,D,E,KR,MA,OM,P,PA,PE,S,SG); Column 2 77.2¢/kg.
- 2401.10.63.30 Flue-cured (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.10.63.60 Burley (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.10.63.80 Maryland (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.10.63.90 Other (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.10.65 Other (under: Other): General 350%; Special Free (AU,BH,CL,IL,KR,MA,OM,P,PA,PE,S,SG) See 9918.24.10-9918.24.11 (CO); Column 2 350%.
- 2401.10.65.30 Flue-cured (under: Other) (kg).
- 2401.10.65.60 Burley (under: Other) (kg).
- 2401.10.65.80 Maryland (under: Other) (kg).
- 2401.10.65.90 Other (under: Other) (kg).
- 2401.10.95 Other (under: Other): General 32.7¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG); Column 2 85¢/kg.
- 2401.10.95.10 Fire-cured Kentucky and Tennessee (kg).
- 2401.10.95.15 Dark-air cured Kentucky and Tennessee (kg).
- 2401.10.95.20 Virginia fire-cured (under: Other) (kg).
- 2401.10.95.25 Virginia sun-cured (under: Other) (kg).
- 2401.10.95.30 Blackfat (under: Other) (kg).
- 2401.10.95.60 Other (under: Other) (kg).
- 2401.20 Tobacco, partly or wholly stemmed/stripped.
- 2401.20.05.00 Leaf tobacco, the product of two or more countries or dependencies, when mixed or packed together (kg): General $5.48/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG); Column 2 $6.45/kg.
- 2401.20.14 Wrapper tobacco (under: Containing over 35 percent wrapper tobacco): General Free; Special none; Column 2 $6.45/kg.
- 2401.20.14.20 Connecticut shade (under: Wrapper tobacco) (kg).
- 2401.20.14.40 Other (under: Wrapper tobacco) (kg).
- 2401.20.18.00 Other (under: Containing over 35 percent wrapper tobacco) (kg): General Free; Special none; Column 2 $6.45/kg.
- 2401.20.23.00 Cigarette leaf (under: Oriental or Turkish type) (kg): General Free; Special none; Column 2 $1.21/kg.
- 2401.20.26.00 Other (under: Oriental or Turkish type) (kg): General Free; Special none; Column 2 $1.15/kg.
- 2401.20.29 Cigar binder and filler (under: Not containing wrapper tobacco, or not containing over 35 percent wrapper tobacco): General Free; Special none; Column 2 $1.15/kg.
- 2401.20.29.70 Binder (under: Cigar binder and filler) (kg).
- 2401.20.29.90 Filler (under: Cigar binder and filler) (kg).
- 2401.20.31 To be used in products other than cigarettes: General 40.9¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.21/kg.
- 2401.20.31.10 Flue-cured (under: To be used in products other than cigarettes) (kg).
- 2401.20.31.20 Burley (under: To be used in products other than cigarettes) (kg).
- 2401.20.31.30 Maryland (under: To be used in products other than cigarettes) (kg).
- 2401.20.31.40 Other (under: To be used in products other than cigarettes) (kg).
- 2401.20.33 Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions: General 40.9¢/kg; Special Free (A+,BH,CL,CO,D,E,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.21/kg.
- 2401.20.33.10 Flue-cured (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.20.33.20 Burley (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.20.33.30 Maryland (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.20.33.40 Other (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.20.35 Other (under: Other): General 350%; Special Free (AU,BH,CL,IL,KR,MA,OM,P,PA,PE,S,SG) See 9918.24.10-9918.24.11 (CO); Column 2 350%.
- 2401.20.35.10 Flue-cured (under: Other) (kg).
- 2401.20.35.20 Burley (under: Other) (kg).
- 2401.20.35.30 Maryland (under: Other) (kg).
- 2401.20.35.40 Other (under: Other) (kg).
- 2401.20.57 Other (under: Other): General 39.7¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.15/kg.
- 2401.20.57.10 Fire-cured Kentucky and Tennessee (kg).
- 2401.20.57.15 Dark-air cured Kentucky and Tennessee (kg).
- 2401.20.57.20 Virginia fire-cured (under: Other) (kg).
- 2401.20.57.25 Virginia sun-cured (under: Other) (kg).
- 2401.20.57.30 Blackfat (under: Other) (kg).
- 2401.20.57.40 Other (under: Other) (kg).
- 2401.20.60 From cigar leaf (under: Threshed or similarly processed): General Free; Special none; Column 2 77.2¢/kg.
- 2401.20.60.20 Connecticut shade (under: From cigar leaf) (kg).
- 2401.20.60.40 Other (under: From cigar leaf) (kg).
- 2401.20.75.00 Oriental or Turkish type (under: Other) (kg): General Free; Special none; Column 2 $1.10/kg.
- 2401.20.83 To be used in products other than cigarettes: General 37.5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.10/kg.
- 2401.20.83.10 Flue-cured (under: To be used in products other than cigarettes) (kg).
- 2401.20.83.20 Burley (under: To be used in products other than cigarettes) (kg).
- 2401.20.83.30 Maryland (under: To be used in products other than cigarettes) (kg).
- 2401.20.83.35 Fire-cured Kentucky and Tennessee (kg).
- 2401.20.83.40 Dark-air cured Kentucky and Tennessee (kg).
- 2401.20.83.50 Virginia fire-cured (under: To be used in products other than cigarettes) (kg).
- 2401.20.83.55 Virginia sun-cured (under: To be used in products other than cigarettes) (kg).
- 2401.20.83.60 Blackfat (under: To be used in products other than cigarettes) (kg).
- 2401.20.83.90 Other (under: To be used in products other than cigarettes) (kg).
- 2401.20.85 Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions: General 37.5¢/kg; Special Free (A+,BH,CL,CO,D,E,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.10/kg.
- 2401.20.85.10 Flue-cured (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.20.85.20 Burley (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.20.85.30 Maryland (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.20.85.35 Fire-cured Kentucky and Tennessee (kg).
- 2401.20.85.40 Dark-air cured Kentucky and Tennessee (kg).
- 2401.20.85.50 Virginia fire-cured (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.20.85.55 Virginia sun-cured (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.20.85.60 Blackfat (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.20.85.90 Other (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions) (kg).
- 2401.20.87 Other (under: Other): General 350%; Special Free (AU,BH,CL,IL,KR,MA,OM,P,PA,PE,S,SG) See 9918.24.10-9918.24.11 (CO); Column 2 350%.
- 2401.20.87.10 Flue-cured (under: Other) (kg).
- 2401.20.87.20 Burley (under: Other) (kg).
- 2401.20.87.30 Maryland (under: Other) (kg).
- 2401.20.87.35 Fire-cured Kentucky and Tennessee (kg).
- 2401.20.87.40 Dark-air cured Kentucky and Tennessee (kg).
- 2401.20.87.50 Virginia fire-cured (under: Other) (kg).
- 2401.20.87.55 Virginia sun-cured (under: Other) (kg).
- 2401.20.87.60 Blackfat (under: Other) (kg).
- 2401.20.87.90 Other (under: Other) (kg).
- 2401.30 Tobacco refuse (under: Unmanufactured tobacco (whether or not threshed or similarly processed); tobacco refuse).
- 2401.30.03.00 Not cut, not ground and not pulverized (kg): General Free; Special none; Column 2 Free.
- 2401.30.06.00 Cut, ground or pulverized (under: Tobacco stems) (kg): General Free; Special none; Column 2 $1.21/kg.
- 2401.30.09.00 Other (under: From cigar leaf) (kg): General Free; Special none; Column 2 77.2¢/kg.
- 2401.30.13.00 Not cut, not ground and not pulverized (kg): General Free; Special none; Column 2 Free.
- 2401.30.16.00 Cut, ground or pulverized (under: Tobacco stems) (kg): General Free; Special none; Column 2 $1.21/kg.
- 2401.30.19.00 Other (under: From Oriental or Turkish type tobacco) (kg): General Free; Special none; Column 2 77.2¢/kg.
- 2401.30.23 Not cut, not ground and not pulverized: General Free; Special none; Column 2 Free.
- 2401.30.23.10 Flue-cured (under: Not cut, not ground and not pulverized) (kg).
- 2401.30.23.20 Burley (under: Not cut, not ground and not pulverized) (kg).
- 2401.30.23.35 Fire-cured Kentucky and Tennessee (kg).
- 2401.30.23.40 Dark air-cured Kentucky and Tennessee (kg).
- 2401.30.23.50 Virginia fire-cured (under: Not cut, not ground and not pulverized) (kg).
- 2401.30.23.60 Virginia sun-cured (under: Not cut, not ground and not pulverized) (kg).
- 2401.30.23.90 Other (under: Not cut, not ground and not pulverized) (kg).
- 2401.30.25 Cut, ground or pulverized (under: Tobacco stems): General 97¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.21/kg.
- 2401.30.25.10 Flue-cured (under: Cut, ground or pulverized) (kg).
- 2401.30.25.20 Burley (under: Cut, ground or pulverized) (kg).
- 2401.30.25.35 Fire-cured Kentucky and Tennessee (kg).
- 2401.30.25.40 Dark air-cured Kentucky and Tennessee (kg).
- 2401.30.25.50 Virginia fire-cured (under: Cut, ground or pulverized) (kg).
- 2401.30.25.60 Virginia sun-cured (under: Cut, ground or pulverized) (kg).
- 2401.30.25.90 Other (under: Cut, ground or pulverized) (kg).
- 2401.30.27 Other (under: To be used in products other than cigarettes): General 28.4¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,KR,MA,OM,P,PA,PE,S,SG); Column 2 77.2¢/kg.
- 2401.30.27.10 Flue-cured (under: Other) (kg).
- 2401.30.27.20 Burley (under: Other) (kg).
- 2401.30.27.35 Fire-cured Kentucky and Tennessee (kg).
- 2401.30.27.40 Dark air-cured Kentucky and Tennessee (kg).
- 2401.30.27.50 Virginia fire-cured (under: Other) (kg).
- 2401.30.27.60 Virginia sun-cured (under: Other) (kg).
- 2401.30.27.90 Other (under: Other) (kg).
- 2401.30.33 Not cut, not ground and not pulverized: General Free; Special none; Column 2 Free.
- 2401.30.33.10 Flue-cured (under: Not cut, not ground and not pulverized) (kg).
- 2401.30.33.20 Burley (under: Not cut, not ground and not pulverized) (kg).
- 2401.30.33.35 Fire-cured Kentucky and Tennessee (kg).
- 2401.30.33.40 Dark air-cured Kentucky and Tennessee (kg).
- 2401.30.33.50 Virginia fire-cured (under: Not cut, not ground and not pulverized) (kg).
- 2401.30.33.60 Virginia sun-cured (under: Not cut, not ground and not pulverized) (kg).
- 2401.30.33.90 Other (under: Not cut, not ground and not pulverized) (kg).
- 2401.30.35 Cut, ground or pulverized (under: Tobacco stems): General 97¢/kg; Special Free (A+,BH,CL,CO,D,E,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.21/kg.
- 2401.30.35.10 Flue-cured (under: Cut, ground or pulverized) (kg).
- 2401.30.35.20 Burley (under: Cut, ground or pulverized) (kg).
- 2401.30.35.35 Fire-cured Kentucky and Tennessee (kg).
- 2401.30.35.40 Dark air-cured Kentucky and Tennessee (kg).
- 2401.30.35.50 Virginia fire-cured (under: Cut, ground or pulverized) (kg).
- 2401.30.35.60 Virginia sun-cured (under: Cut, ground or pulverized) (kg).
- 2401.30.35.90 Other (under: Cut, ground or pulverized) (kg).
- 2401.30.37 Other (under: Described in additional U.S. note 5 to this chapter and entered pursuant to its provisions): General 28.4¢/kg; Special Free (A+,BH,CL,CO,D,E,KR,MA,OM,P,PA,PE,S,SG); Column 2 77.2¢/kg.
- 2401.30.37.10 Flue-cured (under: Other) (kg).
- 2401.30.37.20 Burley (under: Other) (kg).
- 2401.30.37.35 Fire-cured Kentucky and Tennessee (kg).
- 2401.30.37.40 Dark air-cured Kentucky and Tennessee (kg).
- 2401.30.37.50 Virginia fire-cured (under: Other) (kg).
- 2401.30.37.60 Virginia sun-cured (under: Other) (kg).
- 2401.30.37.90 Other (under: Other) (kg).
- 2401.30.70 Other (under: Other): General 350%; Special Free (AU,BH,CL,IL,KR,MA,OM,P,PA,PE,S,SG) See 9918.24.10-9918.24.11 (CO); Column 2 350%.
- 2401.30.70.10 Flue-cured (under: Other) (kg).
- 2401.30.70.20 Burley (under: Other) (kg).
- 2401.30.70.35 Fire-cured Kentucky and Tennessee (kg).
- 2401.30.70.40 Dark air-cured Kentucky and Tennessee (kg).
- 2401.30.70.50 Virginia fire-cured (under: Other) (kg).
- 2401.30.70.60 Virginia sun-cured (under: Other) (kg).
- 2401.30.70.90 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.