HTS Heading 2503
Sulfur of all kinds, other than sublimed sulfur, precipitated sulfur and colloidal sulfur
All 2 HTS codes under heading 2503 (sulfur of all kinds, other than sublimed sulfur), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2503
- 2503.00.00 Sulfur of all kinds, other than sublimed sulfur, precipitated sulfur and colloidal sulfur: General Free; Special none; Column 2 Free.
- 2503.00.00.10 Crude or unrefined sulfur (under: Sulfur of all kinds, other than sublimed sulfur, precipitated sulfur and colloidal sulfur) (t).
- 2503.00.00.90 Other (under: Sulfur of all kinds, other than sublimed sulfur, precipitated sulfur and colloidal sulfur) (t).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.