HTS Heading 2510

Natural calcium phosphates, natural aluminum calcium phosphates and phosphatic chalk

All 2 HTS codes under heading 2510 (natural calcium phosphates), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2510

  • 2510 Natural calcium phosphates, natural aluminum calcium phosphates and phosphatic chalk.
  • 2510.10.00.00 Unground (under: Natural calcium phosphates, natural aluminum calcium phosphates and phosphatic chalk) (t): General Free; Special none; Column 2 Free.
  • 2510.20.00.00 Ground (under: Natural calcium phosphates, natural aluminum calcium phosphates and phosphatic chalk) (t): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.