HTS Heading 2513

Pumice; emery; natural corundum, natural garnet and other natural abrasives, whether or not heat-treated

All 4 HTS codes under heading 2513 (pumice), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2513

  • 2513 Pumice; emery; natural corundum, natural garnet and other natural abrasives, whether or not heat-treated.
  • 2513.10.00 Pumice stone (under: Pumice; emery; natural corundum, natural garnet and other natural abrasives, whether or not heat-treated): General Free; Special none; Column 2 Free.
  • 2513.10.00.10 Crude or in irregular pieces, including crushed pumice (kg).
  • 2513.10.00.80 Other (under: Pumice stone) (kg).
  • 2513.20 Emery, natural corundum, natural garnet and other natural abrasives.
  • 2513.20.10.00 Crude or in irregular pieces (under: Emery, natural corundum, natural garnet and other natural abrasives) (kg): General Free; Special none; Column 2 Free.
  • 2513.20.90.00 Other (under: Emery, natural corundum, natural garnet and other natural abrasives) (kg): General Free; Special none; Column 2 2.2¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.