HTS Heading 2528
Natural borates and concentrates thereof (whether or not calcined), but not including borates separated from natural brine; natural boric acid containing not more than 85 percent of H3BO3 calculated on the dry weight
All 3 HTS codes under heading 2528 (natural borates and concentrates thereof), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2528
- 2528.00.00 Natural borates and concentrates thereof (whether or not calcined), but not including borates separated from natural brine; natural boric acid containing not more than 85 percent of H3BO3 calculated on the dry weight: General Free; Special none; Column 2 Free.
- 2528.00.00.05 Natural sodium borates and concentrates thereof (whether or not calcined) (kg).
- 2528.00.00.10 Natural calcium borates (under: Natural borates and concentrates thereof (whether or not calcined), but not including borates separated from natural brine; natural boric acid containing not more than 85 percent of H3BO3 calculated on the dry weight) (kg).
- 2528.00.00.50 Other (under: Natural borates and concentrates thereof (whether or not calcined), but not including borates separated from natural brine; natural boric acid containing not more than 85 percent of H3BO3 calculated on the dry weight) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.