HTS Heading 2608
Zinc ores and concentrates
All 5 HTS codes under heading 2608 (zinc ores and concentrates), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2608
- 2608.00.00 Zinc ores and concentrates: General Free; Special none; Column 2 8.8¢/kg on copper content + 3.3¢/kg on lead content + 3.7¢/kg on zinc content.
- 2608.00.00.10 Copper content (under: Zinc ores and concentrates) (Cu kg).
- 2608.00.00.20 Lead content (under: Zinc ores and concentrates) (Pb kg).
- 2608.00.00.30 Zinc content (under: Zinc ores and concentrates) (Zn kg).
- 2608.00.00.40 Silver content (under: Zinc ores and concentrates) (Ag g).
- 2608.00.00.50 Gold content (under: Zinc ores and concentrates) (Au g).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.