HTS Heading 2801
Fluorine, chlorine, bromine and iodine
All 4 HTS codes under heading 2801 (fluorine, chlorine, bromine and iodine), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.5%.
Every line of heading 2801
- 2801 Fluorine, chlorine, bromine and iodine.
- 2801.10.00.00 Chlorine (under: Fluorine, chlorine, bromine and iodine) (kg): General Free; Special none; Column 2 25%.
- 2801.20.00.00 Iodine (under: Fluorine, chlorine, bromine and iodine) (kg): General Free; Special none; Column 2 Free.
- 2801.30 Fluorine; bromine (under: Fluorine, chlorine, bromine and iodine).
- 2801.30.10.00 Fluorine (under: Fluorine; bromine) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2801.30.20.00 Bromine (under: Fluorine; bromine) (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S, SG); Column 2 37%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.