HTS Heading 2819

Chromium oxides and hydroxides

All 2 HTS codes under heading 2819 (chromium oxides and hydroxides), with their duty rates from the 2026 HTS Revision 23. General duty 3.7%.

Every line of heading 2819

  • 2819 Chromium oxides and hydroxides.
  • 2819.10.00.00 Chromium trioxide (under: Chromium oxides and hydroxides) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2819.90.00.00 Other (under: Chromium oxides and hydroxides) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.