HTS Heading 2824

Lead oxides; red lead and orange lead

All 4 HTS codes under heading 2824 (lead oxides), with their duty rates from the 2026 HTS Revision 23. General duty 3% to 5.5%.

Every line of heading 2824

  • 2824 Lead oxides; red lead and orange lead.
  • 2824.10.00.00 Lead monoxide (litharge, massicot) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 12%.
  • 2824.90 Other (under: Lead oxides; red lead and orange lead).
  • 2824.90.10.00 Lead suboxide (leady litharge) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 2824.90.20.00 Red lead and orange lead (under: Other) (kg): General 3.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 12.5%.
  • 2824.90.50.00 Other (under: Other) (kg): General 4.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.