HTS Heading 2832

Sulfites; thiosulfates

All 4 HTS codes under heading 2832 (sulfites), with their duty rates from the 2026 HTS Revision 23. General duty 1.5% to 3.1%.

Every line of heading 2832

  • 2832 Sulfites; thiosulfates.
  • 2832.10.00.00 Sodium sulfites (under: Sulfites; thiosulfates) (kg): General 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.5%.
  • 2832.20.00.00 Other sulfites (under: Sulfites; thiosulfates) (kg): General 3.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2832.30 Thiosulfates (under: Sulfites; thiosulfates).
  • 2832.30.10.00 Sodium thiosulfate (under: Thiosulfates) (kg): General 1.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.5%.
  • 2832.30.50.00 Other (under: Thiosulfates) (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.