HTS Heading 2835

Phosphinates (hypophosphites), phosphonates (phosphites) and phosphates; polyphosphates, whether or not chemically defined

All 12 HTS codes under heading 2835 (phosphinates (hypophosphites)), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.1%.

Every line of heading 2835

  • 2835 Phosphinates (hypophosphites), phosphonates (phosphites) and phosphates; polyphosphates, whether or not chemically defined.
  • 2835.10.00.00 Phosphinates (hypophosphites) and phosphonates (phosphites) (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2835.22.00.00 Of mono- or disodium (under: Phosphates) (kg): General 1.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6%.
  • 2835.24.00.00 Of potassium (under: Phosphates) (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2835.25.00.00 Calcium hydrogenorthophosphate ("Dicalcium phosphate") (kg): General Free; Special none; Column 2 25%.
  • 2835.26.00.00 Other phosphates of calcium (under: Phosphates) (kg): General Free; Special none; Column 2 25%.
  • 2835.29 Other (under: Phosphates).
  • 2835.29.10.00 Of aluminum (under: Other) (kg): General Free; Special none; Column 2 25%.
  • 2835.29.20.00 Of triammonium (under: Other) (kg): General 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.5%.
  • 2835.29.30.00 Of trisodium (under: Other) (kg): General 2.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11.5%.
  • 2835.29.51.00 Other (under: Other) (kg): General 4.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2835.31.00.00 Sodium triphosphate (Sodium tripolyphosphate) (kg): General 1.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6%.
  • 2835.39 Other (under: Polyphosphates).
  • 2835.39.10.00 Of potassium (under: Other) (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2835.39.50.00 Other (under: Other) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.