HTS Heading 2842

Other salts of inorganic acids or peroxoacids (including aluminosilicates whether or not chemically defined), other than azides

All 4 HTS codes under heading 2842 (other salts of inorganic acids), with their duty rates from the 2026 HTS Revision 23. General duty 3.1% to 3.7%.

Every line of heading 2842

  • 2842 Other salts of inorganic acids or peroxoacids (including aluminosilicates whether or not chemically defined), other than azides.
  • 2842.10.00.00 Double or complex silicates, including aluminosilicates whether or not chemically defined (kg): General 3.7%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,K,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 2842.90 Other (under: Other salts of inorganic acids or peroxoacids (including aluminosilicates whether or not chemically defined), other than azides).
  • 2842.90.10.00 Fulminates, cyanates and thiocyanates (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2842.90.90 Other (under: Other): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2842.90.90.10 Selenides and tellurides (under: Other) (kg).
  • 2842.90.90.50 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.