HTS Heading 2902

Cyclic hydrocarbons

All 19 HTS codes under heading 2902 (cyclic hydrocarbons), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 2902

  • 2902 Cyclic hydrocarbons.
  • 2902.11.00.00 Cyclohexane (under: Cyclanes, cyclenes and cycloterpenes) (kg): General Free; Special none; Column 2 15.4¢/kg + 40%.
  • 2902.19.00 Other (under: Cyclanes, cyclenes and cycloterpenes): General Free; Special none; Column 2 25%.
  • 2902.19.00.10 Dicyclopentadiene (under: Other) (kg).
  • 2902.19.00.50 Other (under: Other) (kg).
  • 2902.20.00.00 Benzene (under: Cyclic hydrocarbons) (liters): General Free; Special none; Column 2 Free.
  • 2902.30.00.00 Toluene (under: Cyclic hydrocarbons) (liters): General Free; Special none; Column 2 Free.
  • 2902.41.00.00 o-Xylene (under: Xylenes) (liters): General Free; Special none; Column 2 Free.
  • 2902.42.00.00 m-Xylene (under: Xylenes) (liters): General Free; Special none; Column 2 Free.
  • 2902.43.00.00 p-Xylene (under: Xylenes) (liters): General Free; Special none; Column 2 Free.
  • 2902.44.00.00 Mixed xylene isomers (under: Xylenes) (liters): General Free; Special none; Column 2 Free.
  • 2902.50.00.00 Styrene (under: Cyclic hydrocarbons) (kg): General Free; Special none; Column 2 15.4¢/kg + 45%.
  • 2902.60.00.00 Ethylbenzene (under: Cyclic hydrocarbons) (kg): General Free; Special none; Column 2 15.4¢/kg + 55%.
  • 2902.70.00.00 Cumene (under: Cyclic hydrocarbons) (kg): General Free; Special none; Column 2 Free.
  • 2902.90 Other (under: Cyclic hydrocarbons).
  • 2902.90.10.00 Pseudocumene (under: Other) (kg): General Free; Special none; Column 2 Free.
  • 2902.90.20.00 Acenaphthene, chrysene, cymene, dimethylnaphthalenes, fluoranthene, fluorene, indene, mesitylene, methylanthracene, methylnaphthalene, phenanthrene and pyrene (kg): General Free; Special none; Column 2 Free.
  • 2902.90.30 Alkylbenzenes and polyalkylbenzenes: General Free; Special none; Column 2 15.4¢/kg + 55%.
  • 2902.90.30.10 Dodecylbenzene (under: Alkylbenzenes and polyalkylbenzenes) (kg).
  • 2902.90.30.50 Other (under: Alkylbenzenes and polyalkylbenzenes) (kg).
  • 2902.90.40.00 Anthracene; and 1,4-Di-(2-methylstyryl)benzene (kg): General Free; Special none; Column 2 15.4¢/kg + 68.5%.
  • 2902.90.60.00 Biphenyl (Diphenyl), in flakes (kg): General Free; Special none; Column 2 15.4¢/kg + 68.5%.
  • 2902.90.90.00 Other (under: Other) (kg): General Free; Special none; Column 2 15.4¢/kg + 68.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.