HTS Heading 2906

Cyclic alcohols and their halogenated, sulfonated, nitrated or nitrosated derivatives

All 12 HTS codes under heading 2906 (cyclic alcohols and their halogenated), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.5%.

Every line of heading 2906

  • 2906 Cyclic alcohols and their halogenated, sulfonated, nitrated or nitrosated derivatives.
  • 2906.11.00.00 Menthol (under: Cyclanic, cyclenic or cycloterpenic) (kg): General 2.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.2%.
  • 2906.12.00.00 Cyclohexanol, methylcyclohexanols and dimethylcyclohexanols (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 53.5%.
  • 2906.13 Sterols and inositols (under: Cyclanic, cyclenic or cycloterpenic).
  • 2906.13.10.00 Inositols (under: Sterols and inositols) (kg): General Free; Special none; Column 2 50%.
  • 2906.13.50.00 Other (under: Sterols and inositols) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2906.19 Other (under: Cyclanic, cyclenic or cycloterpenic).
  • 2906.19.10.00 4,4'-Isopropylidenedicyclohexanol; and mixtures containing not less than 90 percent by weight of stereoisomers of 2-isopropyl- 5-methylcyclohexanol, but containing not more than 30 percent by weight of any one such stereoisomer (kg): General Free; Special none; Column 2 45%.
  • 2906.19.30.00 Terpineols (under: Other) (kg): General 5.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 2906.19.50.00 Other (under: Other) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 2906.21.00.00 Benzyl alcohol (under: Aromatic) (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 40%.
  • 2906.29 Other (under: Aromatic).
  • 2906.29.10.00 Phenethyl alcohol (under: Odoriferous or flavoring compounds) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 77%.
  • 2906.29.20.00 Other (under: Odoriferous or flavoring compounds) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 58%.
  • 2906.29.30.00 1,1-Bis(4-chlorophenyl)- 2,2,2-trichloro-ethanol (Dicofol); andp-Nitrobenzyl alcohol (kg): General Free; Special none; Column 2 15.4¢/kg + 40%.
  • 2906.29.60.00 Other (under: Other) (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,L,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.