HTS Heading 2909

Ethers, ether-alcohols, ether-phenols, ether-alcohol- phenols, alcohol peroxides, ether peroxides, acetal and hemiacetal peroxides, ketone peroxides (whether or not chemically defined), and their halogenated, sulfonated, nitrated or nitrosated derivatives

All 33 HTS codes under heading 2909 (ethers, ether-alcohols, ether-phenols), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.5%.

Every line of heading 2909

  • 2909 Ethers, ether-alcohols, ether-phenols, ether-alcohol- phenols, alcohol peroxides, ether peroxides, acetal and hemiacetal peroxides, ketone peroxides (whether or not chemically defined), and their halogenated, sulfonated, nitrated or nitrosated derivatives.
  • 2909.11.00.00 Diethyl ether (under: Acyclic ethers and their halogenated, sulfonated, nitrated or nitrosated derivatives) (kg): General 1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4%.
  • 2909.19 Other (under: Acyclic ethers and their halogenated, sulfonated, nitrated or nitrosated derivatives).
  • 2909.19.14.00 Methyl tertiary-butyl ether (MTBE) (kg): General 5.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 37%.
  • 2909.19.18.00 Other (under: Ethers of monohydric alcohols) (kg): General 5.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 37%.
  • 2909.19.30.00 Triethylene glycol dichloride (kg): General Free; Special none; Column 2 54.5%.
  • 2909.19.60.00 Other (under: Ethers of polyhydric alcohols) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 54.5%.
  • 2909.20.00.00 Cyclanic, cyclenic or cycloterpenic ethers and their halogenated, sulfonated, nitrated or nitrosated derivatives (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2909.30 Aromatic ethers and their halogenated, sulfonated, nitrated or nitrosated derivatives.
  • 2909.30.05.00 5-Chloro-2-nitroanisole; 6-Chloro-3-nitro-p-dimethoxybenzene; and Dimethyl diphenyl ether (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 40%.
  • 2909.30.07.00 Decabromodiphenyl oxide; and Octabromodiphenyl oxide (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 70.5%.
  • 2909.30.09.00 Bis(tribromophenoxy)ethane; Pentabromodiphenyl oxide; and Tetra decabromodiphenoxy benzene (kg): General Free; Special none; Column 2 15.4¢/kg + 70.5%.
  • 2909.30.10.00 6-tert-Butyl-3-methyl-2,4-dinitroanisole (Musk ambrette) and other artificial musks (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg +57%.
  • 2909.30.20.00 Other (under: Odoriferous or flavoring compounds) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg +58%.
  • 2909.30.30.00 Pesticides (under: Other) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg +48.5%.
  • 2909.30.40.00 Products described in additional U.S. note 3 to section VI (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 70.5%.
  • 2909.30.60.00 Other (under: Other) (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 70.5%.
  • 2909.41.00.00 2,2'-Oxydiethanol (Diethylene glycol, Digol) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 54.5%.
  • 2909.43.00.00 Monobutyl ethers of ethylene glycol or of diethylene glycol (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 54.5%.
  • 2909.44.01 Other monoalkyl ethers of ethylene glycol or of diethylene glycol: General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 54.5%.
  • 2909.44.01.10 Monomethyl ethers of ethylene glycol or of diethylene glycol (kg).
  • 2909.44.01.50 Other (under: Other monoalkyl ethers of ethylene glycol or of diethylene glycol) (kg).
  • 2909.49 Other (under: Ether-alcohols and their halogenated, sulfonated, nitrated or nitrosated derivatives).
  • 2909.49.05.00 Guaifenesin (under: Aromatic) (kg): General Free; Special none; Column 2 15.4¢/kg + 79%.
  • 2909.49.10.00 Products described in additional U.S. note 3 to section VI (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 70.5%.
  • 2909.49.15.00 Other (under: Other) (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 70.5%.
  • 2909.49.20.00 Glycerol ethers (under: Other) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2909.49.30.00 Dipentaerythritol having a purity of 94 percent or more by weight (kg): General Free; Special none; Column 2 54.5%.
  • 2909.49.60.00 Other (under: Other) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 54.5%.
  • 2909.50 Ether-phenols, ether-alcohol-phenols and their halogenated, sulfonated, nitrated or nitrosated derivatives.
  • 2909.50.10.00 4-Ethylguaiacol (under: Ether-phenols, ether-alcohol-phenols and their halogenated, sulfonated, nitrated or nitrosated derivatives) (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 40%.
  • 2909.50.20.00 Guaiacol and its derivatives (under: Ether-phenols, ether-alcohol-phenols and their halogenated, sulfonated, nitrated or nitrosated derivatives) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg +79%.
  • 2909.50.40 Odoriferous or flavoring compounds: General 4.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 2909.50.40.10 Eugenol and isoeugenol (under: Odoriferous or flavoring compounds) (kg).
  • 2909.50.40.50 Other (under: Odoriferous or flavoring compounds) (kg).
  • 2909.50.45.00 Products described in additional U.S. note 3 to section VI (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 70.5%.
  • 2909.50.50.00 Other (under: Other) (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 70.5%.
  • 2909.60 Alcohol peroxides, ether peroxides, acetal and hemiacetal peroxides, ketone peroxides and their halogenated, sulfonated, nitrated or nitrosated derivatives.
  • 2909.60.10.00 Products described in additional U.S. note 3 to section VI (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 70.5%.
  • 2909.60.20.00 Other (under: Aromatic) (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 70.5%.
  • 2909.60.50.00 Other (under: Alcohol peroxides, ether peroxides, acetal and hemiacetal peroxides, ketone peroxides and their halogenated, sulfonated, nitrated or nitrosated derivatives) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.