HTS Heading 2911
Acetals and hemiacetals, whether or not with other oxygen function, and their halogenated, sulfonated, nitrated or nitrosated derivatives
All 2 HTS codes under heading 2911 (acetals and hemiacetals), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.3%.
Every line of heading 2911
- 2911.00 Acetals and hemiacetals, whether or not with other oxygen function, and their halogenated, sulfonated, nitrated or nitrosated derivatives.
- 2911.00.10.00 1,1-Bis(1-methylethoxy)cyclohexane (kg): General Free; Special none; Column 2 36.5%.
- 2911.00.50.00 Other (under: Acetals and hemiacetals, whether or not with other oxygen function, and their halogenated, sulfonated, nitrated or nitrosated derivatives) (kg): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 36.5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.