HTS Heading 2913

Halogenated, sulfonated, nitrated or nitrosated derivatives of products of heading 2912

All 3 HTS codes under heading 2913 (halogenated, sulfonated), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.5%.

Every line of heading 2913

  • 2913.00 Halogenated, sulfonated, nitrated or nitrosated derivatives of products of heading 2912.
  • 2913.00.20.00 4-Fluoro-3-phenoxybenzaldehyde (kg): General Free; Special none; Column 2 15.4¢/kg + 77.5%.
  • 2913.00.40.00 Other (under: Aromatic) (kg): General 5.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,L,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 77.5%.
  • 2913.00.50.00 Other (under: Halogenated, sulfonated, nitrated or nitrosated derivatives of products of heading 2912) (kg): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 37%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.