HTS Heading 2917
Polycarboxylic acids, their anhydrides, halides, peroxides and peroxyacids; their halogenated, sulfonated, nitrated or nitrosated derivatives
All 36 HTS codes under heading 2917 (polycarboxylic acids, their anhydrides), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.
Every line of heading 2917
- 2917 Polycarboxylic acids, their anhydrides, halides, peroxides and peroxyacids; their halogenated, sulfonated, nitrated or nitrosated derivatives.
- 2917.11.00.00 Oxalic acid, its salts and esters (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,L,MA,OM,P,PA,PE,S,SG); Column 2 34.5%.
- 2917.12 Adipic acid, its salts and esters.
- 2917.12.10.00 Adipic acid (under: Adipic acid, its salts and esters) (kg): General 6.5%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 63%.
- 2917.12.20.00 Plasticizers (under: Other) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 57%.
- 2917.12.50.00 Other (under: Other) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 53.5%.
- 2917.13.00 Azelaic acid, sebacic acid, their salts and esters: General 4.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2917.13.00.30 Sebacic acid (under: Azelaic acid, sebacic acid, their salts and esters) (kg).
- 2917.13.00.90 Other (under: Azelaic acid, sebacic acid, their salts and esters) (kg).
- 2917.14 Maleic anhydride (under: Acyclic polycarboxylic acids, their anhydrides, halides, peroxides, peroxyacids and their derivatives).
- 2917.14.10.00 Derived in whole or in part from benzene or other aromatic hydrocarbons (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 50%.
- 2917.14.50.00 Other (under: Maleic anhydride) (kg): General 4.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2917.19 Other (under: Acyclic polycarboxylic acids, their anhydrides, halides, peroxides, peroxyacids and their derivatives).
- 2917.19.10.00 Ferrous fumarate (under: Other) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 45%.
- 2917.19.15.00 Derived in whole or in part from aromatic hydrocarbons (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 87%.
- 2917.19.17.00 Other (under: Fumaric acid) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2917.19.20.00 Products described in additional U.S. note 3 to section VI (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,K,KR,L,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 53.5%.
- 2917.19.23.00 Maleic acid (under: Other) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 53.5%.
- 2917.19.27.00 Other (under: Other) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 53.5%.
- 2917.19.30.00 Ethylene brassylate (under: Other) (kg): General 4.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 2917.19.35.00 Malonic acid (under: Other) (kg): General Free; Special none; Column 2 25%.
- 2917.19.40.00 Derived in whole or in part from aromatic hydrocarbons (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, K,KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 40%.
- 2917.19.70 Other (under: Other): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,L,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2917.19.70.20 Plasticizers (under: Other) (kg).
- 2917.19.70.50 Other (under: Other) (kg).
- 2917.20.00.00 Cyclanic, cyclenic or cycloterpenic polycarboxylic acids, their anhydrides, halides, peroxides, peroxyacids and their derivatives (kg): General 4.2%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,L,MA,OM,P, PA,PE,S,SG); Column 2 25%.
- 2917.32.00.00 Dioctyl orthophthalates (under: Aromatic polycarboxylic acids, their anhydrides, halides, peroxides, peroxyacids and their derivatives) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 57%.
- 2917.33.00 Dinonyl or didecyl orthophthalates: General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 57%.
- 2917.33.00.10 Diisodecyl orthophthalate (under: Dinonyl or didecyl orthophthalates) (kg).
- 2917.33.00.50 Other (under: Dinonyl or didecyl orthophthalates) (kg).
- 2917.34.01 Other esters of orthophthalic acid: General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 57%.
- 2917.34.01.10 Dibutyl orthophthalate (under: Other esters of orthophthalic acid) (kg).
- 2917.34.01.50 Other (under: Other esters of orthophthalic acid) (kg).
- 2917.35.00.00 Phthalic anhydride (under: Aromatic polycarboxylic acids, their anhydrides, halides, peroxides, peroxyacids and their derivatives) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 49%.
- 2917.36.00.00 Terephthalic acid and its salts (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 57%.
- 2917.37.00.00 Dimethyl terephthalate (under: Aromatic polycarboxylic acids, their anhydrides, halides, peroxides, peroxyacids and their derivatives) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 42%.
- 2917.39 Other (under: Aromatic polycarboxylic acids, their anhydrides, halides, peroxides, peroxyacids and their derivatives).
- 2917.39.04.00 1,2,4-Benzenetricarboxylic acid, 1,2-dianhydride (Trimellitic anhydride); Phthalic acid; and 4-Sulfo-1,8-naphthalic anhydride (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 37%.
- 2917.39.08.00 Naphthalic anhydride (under: Other) (kg): General Free; Special none; Column 2 15.4¢/kg + 37%.
- 2917.39.12.00 4,4'-(Hexafluoroisopropylidene)bis(phthalic anhydride) (kg): General Free; Special none; Column 2 15.4¢/kg + 73%.
- 2917.39.15.00 Isophthalic acid (under: Other) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 40%.
- 2917.39.17.00 Tetrabromophthalic anhydride (under: Other) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 73%.
- 2917.39.20.00 Plasticizers (under: Other) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 57%.
- 2917.39.30.00 Products described in additional U.S. note 3 to section VI (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 73%.
- 2917.39.70.00 Other (under: Other) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,L,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 73%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.