HTS Heading 2920
Esters of other inorganic acids of nonmetals (excluding esters of hydrogen halides) and their salts; their halogenated, sulfonated, nitrated or nitrosated derivatives
All 14 HTS codes under heading 2920 (esters of other inorganic acids), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.
Every line of heading 2920
- 2920 Esters of other inorganic acids of nonmetals (excluding esters of hydrogen halides) and their salts; their halogenated, sulfonated, nitrated or nitrosated derivatives.
- 2920.11.00.00 Parathion (ISO) and parathion-methyl (ISO) (methyl-parathion) (kg): General Free; Special none; Column 2 15.4¢/kg + 64.5%.
- 2920.19 Other (under: Thiophosphoric esters (phosphorodithioates) and their salts, their halogenated, sulfonated, nitrated or nitrosated derivatives).
- 2920.19.10.00 O,O-Dimethyl-O-(4-nitro-m-tolyl)phosphoro- thioate (Fenitrothion) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 41%.
- 2920.19.40.00 Other (under: Aromatic) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 64.5%.
- 2920.19.50.00 Other (under: Other) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2920.21.00.00 Dimethyl phosphite (under: Phosphite esters and their salts; their halogenated, sulfonated, nitrated or nitrosated derivatives) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2920.22.00.00 Diethyl phosphite (under: Phosphite esters and their salts; their halogenated, sulfonated, nitrated or nitrosated derivatives) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2920.23.00.00 Trimethyl phosphite (under: Phosphite esters and their salts; their halogenated, sulfonated, nitrated or nitrosated derivatives) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2920.24.00.00 Triethyl phosphite (under: Phosphite esters and their salts; their halogenated, sulfonated, nitrated or nitrosated derivatives) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2920.29.00.00 Other (under: Phosphite esters and their salts; their halogenated, sulfonated, nitrated or nitrosated derivatives) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2920.30.00.00 Endosulfan (ISO) (under: Esters of other inorganic acids of nonmetals (excluding esters of hydrogen halides) and their salts; their halogenated, sulfonated, nitrated or nitrosated derivatives) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2920.90 Other (under: Esters of other inorganic acids of nonmetals (excluding esters of hydrogen halides) and their salts; their halogenated, sulfonated, nitrated or nitrosated derivatives).
- 2920.90.10.00 Pesticides (under: Aromatic) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 64.5%.
- 2920.90.20.00 Other (under: Aromatic) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 53%.
- 2920.90.51 Other (under: Other): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 2920.90.51.10 Ethylene carbonate (1,3-dioxolan-2-one) (kg).
- 2920.90.51.50 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.