HTS Heading 2923

Quaternary ammonium salts and hydroxides; lecithins and other phosphoaminolipids, whether or not chemically defined

All 7 HTS codes under heading 2923 (quaternary ammonium salts and hydroxides), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.2%.

Every line of heading 2923

  • 2923 Quaternary ammonium salts and hydroxides; lecithins and other phosphoaminolipids, whether or not chemically defined.
  • 2923.10.00.00 Choline and its salts (under: Quaternary ammonium salts and hydroxides; lecithins and other phosphoaminolipids, whether or not chemically defined) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 2923.20 Lecithins and other phosphoaminolipids.
  • 2923.20.10.00 Purified egg phospholipids, pharmaceutical grade meeting requirements of the U.S. Food and Drug Administration, for use in intravenous fat emulsion (kg): General Free; Special none; Column 2 16.5¢/kg + 30%.
  • 2923.20.20 Other (under: Lecithins and other phosphoaminolipids): General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 33.4%.
  • 2923.20.20.10 Certified organic lecithins (under: Other) (kg).
  • 2923.20.20.50 Other (under: Other) (kg).
  • 2923.30.00.00 Tetraethylammonium perfluorooctane sulfonate (kg): General 6.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 36%.
  • 2923.40.00.00 Didecylmethylammonium perfluorooctane sulfonate (kg): General 6.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 36%.
  • 2923.90.01.00 Other (under: Quaternary ammonium salts and hydroxides; lecithins and other phosphoaminolipids, whether or not chemically defined) (kg): General 6.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 36%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.