HTS Heading 2929
Compounds with other nitrogen function
All 18 HTS codes under heading 2929 (compounds with other nitrogen function), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.
Every line of heading 2929
- 2929 Compounds with other nitrogen function.
- 2929.10 Isocyanates (under: Compounds with other nitrogen function).
- 2929.10.10.00 Toluenediisocyanates (unmixed) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 40%.
- 2929.10.15.00 Mixtures of 2,4- and 2,6-toluenediisocyanates (kg): General 6.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 43.5%.
- 2929.10.20.00 Bitolylene diisocyanate (TODI);o-Isocyanic acid, o-tolyl ester; and Xylene diisocyanate (kg): General 5.8%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 40%.
- 2929.10.27.00 N-Butylisocyanate; Cyclohexyl isocyanate; 1-Isocyanato-3-(trifluoromethyl) benzene; 1,5-Naphthalene diisocyanate; and Octadecyl isocyanate (kg): General Free; Special none; Column 2 15.4¢/kg + 52%.
- 2929.10.30.00 3,4-Dichlorophenylisocyanate (under: Isocyanates) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 52%.
- 2929.10.35.00 1,6-Hexamethylene diisocyanate (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 52%.
- 2929.10.55.00 Products described in additional U.S. note 3 to section VI (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 52%.
- 2929.10.80 Other (under: Other): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 52%.
- 2929.10.80.10 Methylenedi-p-phenylene isocyanate (MDI) (kg).
- 2929.10.80.90 Other (under: Other) (kg).
- 2929.90 Other (under: Compounds with other nitrogen function).
- 2929.90.05.00 2,2'-Bis(4-cyanatophenyl)-1,1,1,3,3,3-hexafluoro- propane; 2,2-Bis((4-cyanatophenyl) propane; 1,1-Ethylidenebis (phenyl-4-cyanate); 4,4'-Methylene bis(2,6-dimethylphenylcyanate); and 1,3-Phenylenebis (1-methylethylidenebis) cyanic acid, 1,4-phenylene ester (kg): General Free; Special none; Column 2 15.4¢/kg + 52%.
- 2929.90.15.00 Products described in additional U.S. note 3 to section VI (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 52%.
- 2929.90.20.00 Other (under: Aromatic) (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO,K, KR,MA,OM,P, PA,PE,S,SG); Column 2 15.4¢/kg + 52%.
- 2929.90.50 Other (under: Other): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 30.5%.
- 2929.90.50.15 N,N-Dimethylphosphoramidic dichloride (kg).
- 2929.90.50.18 Other (under: N,N-Dialkyl (methyl, ethyl,n-propyl or isopropyl) phosphoramidic dihalides) (kg).
- 2929.90.50.20 Dialkyl (methyl, ethyl, n-propyl or isopropyl)-N,N-dialkyl (methyl, ethyl, n-propyl or isopropyl) phosphoramidates (kg).
- 2929.90.50.30 N-(Dialkyl (≤C10, incl. cycloalkyl) amino))alkylidene (H or ≤C10, incl. cycloalkyl) phosphonamidic fluorides and corresponding alkylated or protonated salts (kg).
- 2929.90.50.40 O-Alkyl (H or ≤C10, incl. cycloalkyl) N-(dialkyl (≤C10, incl. cycloalkyl) amino))alkylidene (H or ≤C10, incl. cycloalkyl) phosphoramidofluoridates and corresponding alkylated or protonated salts (kg).
- 2929.90.50.95 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.