HTS Heading 3102
Mineral or chemical fertilizers, nitrogenous
All 11 HTS codes under heading 3102 (mineral or chemical fertilizers, nitrogenous), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 3102
- 3102 Mineral or chemical fertilizers, nitrogenous.
- 3102.10.00 Urea, whether or not in aqueous solution: General Free; Special none; Column 2 Free.
- 3102.10.00.10 Solid urea (under: Urea, whether or not in aqueous solution) (t).
- 3102.10.00.30 Diesel exhaust fluid (DEF) of a kind meeting ISO 22241 (t).
- 3102.10.00.50 Other (under: Other) (t).
- 3102.21.00.00 Ammonium sulfate (under: Ammonium sulfate; double salts and mixtures of ammonium sulfate and ammonium nitrate) (t): General Free; Special none; Column 2 Free.
- 3102.29.00.00 Other (under: Ammonium sulfate; double salts and mixtures of ammonium sulfate and ammonium nitrate) (t): General Free; Special none; Column 2 Free.
- 3102.30.00.00 Ammonium nitrate, whether or not in aqueous solution (t): General Free; Special none; Column 2 Free.
- 3102.40.00.00 Mixtures of ammonium nitrate with calcium carbonate or other inorganic nonfertilizing substances (t): General Free; Special none; Column 2 Free.
- 3102.50.00.00 Sodium nitrate (under: Mineral or chemical fertilizers, nitrogenous) (t): General Free; Special none; Column 2 Free.
- 3102.60.00.00 Double salts and mixtures of calcium nitrate and ammonium nitrate (t): General Free; Special none; Column 2 Free.
- 3102.80.00.00 Mixtures of urea and ammonium nitrate in aqueous or ammoniacal solution (t): General Free; Special none; Column 2 Free.
- 3102.90.01.00 Other, including mixtures not specified in the foregoing subheadings (t): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.