HTS Heading 3203

Coloring matter of vegetable or animal origin (including dyeing extracts but excluding animal black), whether or not chemically defined; preparations as specified in note 3 to this chapter based on coloring matter of vegetable or animal origin

All 3 HTS codes under heading 3203 (coloring matter of vegetable), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.1%.

Every line of heading 3203

  • 3203.00 Coloring matter of vegetable or animal origin (including dyeing extracts but excluding animal black), whether or not chemically defined; preparations as specified in note 3 to this chapter based on coloring matter of vegetable or animal origin.
  • 3203.00.10.00 Annato, archil, cochineal, cudbear, litmus, logwood and marigold meal (kg): General Free; Special none; Column 2 Free.
  • 3203.00.30.00 Mixtures of 3,4-dihydroxyphenyl-2,4,6-trihydroxy- phenylmethanone and 2-(2,4-dihydroxyphenyl)-3,5,7- trihydroxy-4H-1-benzopyran-4-one (kg): General Free; Special none; Column 2 15%.
  • 3203.00.80.00 Other (under: Coloring matter of vegetable or animal origin (including dyeing extracts but excluding animal black), whether or not chemically defined; preparations as specified in note 3 to this chapter based on coloring matter of vegetable or animal origin) (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 15%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.