HTS Heading 3706
Motion-picture film, exposed and developed, whether or not incorporating sound track or consisting only of sound track
All 6 HTS codes under heading 3706 (motion-picture film, exposed and developed), with their duty rates from the 2026 HTS Revision 23. General duty Free to 1.4%.
Every line of heading 3706
- 3706 Motion-picture film, exposed and developed, whether or not incorporating sound track or consisting only of sound track.
- 3706.10 Of a width of 35 mm or more (under: Motion-picture film, exposed and developed, whether or not incorporating sound track or consisting only of sound track).
- 3706.10.30.00 Sound recordings on motion-picture film suitable for use in connection with motion-picture exhibits (m): General 1.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7%.
- 3706.10.60 Other (under: Of a width of 35 mm or more): General Free; Special none; Column 2 10¢/m.
- 3706.10.60.30 Positive release prints (under: Feature films) (m).
- 3706.10.60.60 Other (under: Feature films) (m).
- 3706.10.60.90 Other (under: Other) (m).
- 3706.90.00 Other (under: Motion-picture film, exposed and developed, whether or not incorporating sound track or consisting only of sound track): General Free; Special none; Column 2 10¢/m.
- 3706.90.00.30 Positive release prints (under: Other) (m).
- 3706.90.00.60 Other (under: Other) (m).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.