HTS Heading 4002
Synthetic rubber and factice derived from oils, in primary forms or in plates, sheets or strip; mixtures of any product of heading 4001 with any product of this heading, in primary forms or in plates, sheets or strip
All 18 HTS codes under heading 4002 (synthetic rubber and factice derived from oils), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4002
- 4002 Synthetic rubber and factice derived from oils, in primary forms or in plates, sheets or strip; mixtures of any product of heading 4001 with any product of this heading, in primary forms or in plates, sheets or strip.
- 4002.11.00.00 Latex (under: Styrene-butadiene rubber (SBR); carboxylated styrene-butadiene rubber (XSBR)) (kg): General Free; Special none; Column 2 20%.
- 4002.19.00 Other (under: Styrene-butadiene rubber (SBR); carboxylated styrene-butadiene rubber (XSBR)): General Free; Special none; Column 2 20%.
- 4002.19.00.14 Styrene-butadiene-styrene block co- polymers produced by solution polymerization (SBS, thermoplastic elastormers), in granules, crumbs or powders (kg).
- 4002.19.00.15 Styrene-butadiene rubber produced by emulsion polymerization (E-SBR) in bales (kg).
- 4002.19.00.16 Styrene-butadiene rubber produced by solution polymerization (S-SBR) in bales (kg).
- 4002.19.00.19 Other (under: Containing 50 percent or less styrene by weight of the dry polymer) (kg).
- 4002.19.00.20 Containing over 50 percent styrene by weight of the dry polymer (kg).
- 4002.20.00.00 Butadiene rubber (BR) (under: Synthetic rubber and factice derived from oils, in primary forms or in plates, sheets or strip; mixtures of any product of heading 4001 with any product of this heading, in primary forms or in plates, sheets or strip) (kg): General Free; Special none; Column 2 20%.
- 4002.31.00.00 Isobutene-isoprene (butyl) rubber (IIR) (kg): General Free; Special none; Column 2 20%.
- 4002.39.00.00 Other (under: Isobutene-isoprene (butyl) rubber (IIR); halo-isobutene-isoprene rubber (CIIR or BIIR)) (kg): General Free; Special none; Column 2 20%.
- 4002.41.00.00 Latex (under: Chloroprene (chlorobutadiene) rubber (CR)) (kg): General Free; Special none; Column 2 20%.
- 4002.49.00.00 Other (under: Chloroprene (chlorobutadiene) rubber (CR)) (kg): General Free; Special none; Column 2 20%.
- 4002.51.00.00 Latex (under: Acrylonitrile-butadiene rubber (NBR)) (kg): General Free; Special none; Column 2 20%.
- 4002.59.00.00 Other (under: Acrylonitrile-butadiene rubber (NBR)) (kg): General Free; Special none; Column 2 20%.
- 4002.60.00.00 Isoprene rubber (IR) (under: Synthetic rubber and factice derived from oils, in primary forms or in plates, sheets or strip; mixtures of any product of heading 4001 with any product of this heading, in primary forms or in plates, sheets or strip) (kg): General Free; Special none; Column 2 20%.
- 4002.70.00.00 Ethylene-propylene-nonconjugated diene rubber (EPDM) (kg): General Free; Special none; Column 2 20%.
- 4002.80.00.00 Mixtures of any product of heading 4001 with any product of this heading (kg): General Free; Special none; Column 2 20%.
- 4002.91.00.00 Latex (under: Other) (kg): General Free; Special none; Column 2 20%.
- 4002.99.00.00 Other (under: Other) (kg): General Free; Special none; Column 2 20%.
From MFG Calcs data: Rubber materials and products
U.S. imports of rubber materials and products (headings 4002, 4009, 4010, 4016) came to $9.22B in 2025, with $1.03B in calculated duty: an effective duty of 11.2%, every duty included.
Effective duty in Sep 2026: 10.0%, against 15.2% in Sep 2025.
Largest sources in 2025: Mexico $2.36B at 1.8% effective duty; China $950M at 45.4% effective duty; Japan $798M at 9.4% effective duty; Germany $663M at 9.7% effective duty; Canada $621M at 1.9% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.