HTS Heading 4202
Trunks, suitcases, vanity cases, attache cases, briefcases, school satchels, spectacle cases, binocular cases, camera cases, musical instrument cases, gun cases, holsters and similar containers; traveling bags, insulated food or beverage bags, toiletry bags, knapsacks and backpacks, handbags, shopping bags, wallets, purses, map cases, cigarette cases, tobacco pouches, tool bags, sports bags, bottle cases, jewelry boxes, powder cases, cutlery cases and similar containers, of leather or of composition leather, of sheeting of plastics, of textile materials, of vulcanized fiber or of paperboard, or wholly or mainly covered with such materials or with paper
All 84 HTS codes under heading 4202 (trunks, suitcases), with their duty rates from the 2026 HTS Revision 23. General duty Free to 20%, some per unit.
Every line of heading 4202
- 4202 Trunks, suitcases, vanity cases, attache cases, briefcases, school satchels, spectacle cases, binocular cases, camera cases, musical instrument cases, gun cases, holsters and similar containers; traveling bags, insulated food or beverage bags, toiletry bags, knapsacks and backpacks, handbags, shopping bags, wallets, purses, map cases, cigarette cases, tobacco pouches, tool bags, sports bags, bottle cases, jewelry boxes, powder cases, cutlery cases and similar containers, of leather or of composition leather, of sheeting of plastics, of textile materials, of vulcanized fiber or of paperboard, or wholly or mainly covered with such materials or with paper.
- 4202.11.00 With outer surface of leather or of composition leather: General 8%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR,MA,NP,OM,P,PA,PE,R,S,SG) 6.4% (E); Column 2 35%.
- 4202.11.00.30 Attache cases, briefcases, school satchels, occupational luggage cases and similar containers (No.).
- 4202.11.00.90 Other (under: With outer surface of leather or of composition leather) (No.).
- 4202.12 With outer surface of plastics or of textile materials.
- 4202.12.21 Trunks, suitcases, vanity cases and similar containers: General 20%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR,MA,NP,OM,P,PA,PE,R,S,SG) 17.5% (E); Column 2 45%.
- 4202.12.21.20 Structured, rigid on all sides (No.).
- 4202.12.21.50 Other (under: Trunks, suitcases, vanity cases and similar containers) (No.).
- 4202.12.29 Other (under: With outer surface of plastics): General 20%; Special Free (AU,BH,CL,CO,D,IL,JO,KR,MA,NP, OM,P,PA,PE,R,S,SG) 17.5% (E); Column 2 45%.
- 4202.12.29.10 Attache cases, briefcases and similar containers (No.).
- 4202.12.29.25 Other (under: Structured, rigid on all sides) (No.).
- 4202.12.29.35 Attache cases, briefcases and similar containers (No.).
- 4202.12.29.85 Other (under: Other) (No.).
- 4202.12.40.00 Of cotton (369) (under: Of vegetable fibers and not of pile or tufted construction) (No., kg): General 6.3%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 4.9% (E); Column 2 40%.
- 4202.12.60.00 Other (870) (under: Of vegetable fibers and not of pile or tufted construction) (No., kg): General 5.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,NP, OM,P,PA,PE,S,SG) 4.4% (E); Column 2 40%.
- 4202.12.81 Of man-made fibers (under: With outer surface of textile materials): General 17.6%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 16.6% (E); Column 2 65%.
- 4202.12.81.30 Attache cases, briefcases, school satchels, occupational luggage cases and similar containers (670) (No., kg).
- 4202.12.81.70 Other (670) (under: Of man-made fibers) (No., kg).
- 4202.12.89 Other (under: With outer surface of textile materials): General 17.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,NP, OM,P,PA,PE,S,SG) 16.6% (E); Column 2 65%.
- 4202.12.89.10 Containing 85 percent or more by weight of silk or silk waste (No., kg).
- 4202.12.89.20 Of cotton (369) (under: Attache cases, briefcases, school satchels, occupational luggage cases and similar containers) (No., kg).
- 4202.12.89.40 Other (870) (under: Attache cases, briefcases, school satchels, occupational luggage cases and similar containers) (No., kg).
- 4202.12.89.50 Containing 85 percent or more by weight of silk or silk waste (No., kg).
- 4202.12.89.60 Of cotton (369) (under: Other) (No., kg).
- 4202.12.89.80 Other (870) (under: Other) (No., kg).
- 4202.19.00.00 Other (under: Trunks, suitcases, vanity cases, attache cases, briefcases, school satchels and similar containers) (No.): General 20%; Special Free (AU,BH,CL,CO,D,IL,JO,KR,MA, OM,P,PA,PE,R,S,SG) 17.5% (E); Column 2 45%.
- 4202.21 With outer surface of leather or of composition leather.
- 4202.21.30.00 Of reptile leather (under: With outer surface of leather or of composition leather) (No.): General 5.3%; Special Free (AU,BH, CL,CO,D,IL, JO,KR,MA, OM,P,PA,PE,R,S, SG) 4.2% (E); Column 2 35%.
- 4202.21.60.00 Valued not over $20 each (under: Other) (No.): General 10%; Special Free (A,AU,BH,CL,CO,D,IL, JO,KR,MA,NP,OM,P,PA,PE,R,S,SG) 8% (E); Column 2 35%.
- 4202.21.90.00 Valued over $20 each (under: Other) (No.): General 9%; Special Free (A,AU,BH,CL,CO,D,IL, JO,KR,MA,NP,OM,P,PA,PE,R,S,SG) 7.2% (E); Column 2 35%.
- 4202.22 With outer surface of sheeting of plastics or of textile materials.
- 4202.22.15.00 With outer surface of sheeting of plastics (No.): General 16%; Special Free (A,AU,BH,CL,CO,D,IL, JO,KR,MA,NP,OM,P,PA,PE,R,S,SG) 15% (E); Column 2 45%.
- 4202.22.35.00 Of abaca (under: Wholly or in part of braid) (No., kg): General 8.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
- 4202.22.40 Other (under: Wholly or in part of braid): General 7.4%; Special Free (AU,BH,CL,CO,IL,JO, KR,MA,NP,OM,P,PA,PE,S,SG) 5.7% (E); Column 2 90%.
- 4202.22.40.10 Containing 85 percent or more by weight of silk or silk waste (No., kg).
- 4202.22.40.20 Of cotton (369) (under: Other) (No., kg).
- 4202.22.40.30 Of man-made fibers (670) (under: Other) (No., kg).
- 4202.22.40.40 Other (871) (under: Other) (No., kg).
- 4202.22.45.00 Of cotton (369) (under: Of vegetable fibers and not of pile or tufted construction) (No., kg): General 6.3%; Special Free (A,AU,BH,CL,CO, D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 4.9% (E); Column 2 40%.
- 4202.22.60.00 Other (871) (under: Of vegetable fibers and not of pile or tufted construction) (No., kg): General 5.7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA, NP,OM,P,PA,PE,S,SG) 4.4% (E); Column 2 40%.
- 4202.22.70.00 Containing 85 percent or more by weight of silk or silk waste (No., kg): General 7%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,NP,OM,P,PA,PE,S,SG); Column 2 65%.
- 4202.22.81.00 Of man-made fibers (670) (under: Other) (No., kg): General 17.6%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 16.6% (E); Column 2 65%.
- 4202.22.89 Other (under: Other): General 17.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,NP, OM,P,PA,PE,S,SG) 16.6% (E); Column 2 65%.
- 4202.22.89.30 Of cotton (369) (under: Other) (No., kg).
- 4202.22.89.70 Of paper yarn (under: Other) (No., kg).
- 4202.22.89.80 Other (871) (under: Other) (No., kg).
- 4202.29 Other (under: Handbags, whether or not with shoulder strap, including those without handle).
- 4202.29.10.00 Of plastics (under: Of materials (other than leather, composition leather, sheeting of plastics, textile materials, vulcanized fiber or paperboard) wholly or mainly covered with paper) (No.): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 4202.29.20.00 Of wood (under: Of materials (other than leather, composition leather, sheeting of plastics, textile materials, vulcanized fiber or paperboard) wholly or mainly covered with paper) (No.): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
- 4202.29.50.00 Other (under: Of materials (other than leather, composition leather, sheeting of plastics, textile materials, vulcanized fiber or paperboard) wholly or mainly covered with paper) (No.): General 7.8%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA, NP,OM,P,PA,PE,S,SG); Column 2 110%.
- 4202.29.90.00 Other (under: Other) (No.): General 20%; Special Free (AU,BH,CL,CO,D,IL,JO,KR,MA,NP,OM,P,PA,PE,R,S,SG) 17.5% (E); Column 2 45%.
- 4202.31 With outer surface of leather or of composition leather.
- 4202.31.30.00 Of reptile leather (under: With outer surface of leather or of composition leather) (No.): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 4202.31.60.00 Other (under: With outer surface of leather or of composition leather) (No.): General 8%; Special Free (A,AU,BH, CL,CO,D,IL, JO,KR,MA,NP,OM,P,PA,PE,R,S,SG) 6.4% (E); Column 2 35%.
- 4202.32 With outer surface of sheeting of plastics or of textile materials.
- 4202.32.10.00 Of reinforced or laminated plastics (No., kg): General 12.1¢/kg + 4.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.10/kg + 40%.
- 4202.32.20.00 Other (under: With outer surface of sheeting of plastics) (No.): General 20%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 4202.32.40.00 Of cotton (369) (under: Of vegetable fibers and not of pile or tufted construction) (No., kg): General 6.3%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 4.9% (E); Column 2 40%.
- 4202.32.80.00 Other (871) (under: Of vegetable fibers and not of pile or tufted construction) (No., kg): General 5.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO, KR,MA,NP,OM,P, PA,PE,S,SG); Column 2 40%.
- 4202.32.85.00 Containing 85 percent or more by weight of silk or silk waste (No., kg): General Free; Special none; Column 2 65%.
- 4202.32.91.00 Of cotton (369) (under: Other) (No., kg): General 17.6%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 16.6% (E); Column 2 65%.
- 4202.32.93.00 Of man-made fibers (670) (under: Other) (No., kg): General 17.6%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 16.6% (E); Column 2 65%.
- 4202.32.99.00 Other (871) (under: Other) (No., kg): General 17.6%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 16.6% (E); Column 2 65%.
- 4202.39 Other (under: Articles of a kind normally carried in the pocket or in the handbag).
- 4202.39.10.00 Of plastics (under: Of material (other than leather, composition leather, sheeting of plastics, textile materials, vulcanized fiber or paperboard) wholly or mainly covered with paper) (No., kg): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 4202.39.20.00 Of wood (under: Of material (other than leather, composition leather, sheeting of plastics, textile materials, vulcanized fiber or paperboard) wholly or mainly covered with paper) (No., kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
- 4202.39.50.00 Other (under: Of material (other than leather, composition leather, sheeting of plastics, textile materials, vulcanized fiber or paperboard) wholly or mainly covered with paper) (No., kg): General 7.8%; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 110%.
- 4202.39.90.00 Other (under: Other) (No., kg): General 20%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 4202.91 With outer surface of leather or of composition leather.
- 4202.91.10.00 Golf bags (under: With outer surface of leather or of composition leather) (No.): General 4.5%; Special Free (AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 3.5% (E); Column 2 35%.
- 4202.91.90 Other (under: With outer surface of leather or of composition leather): General 4.5%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 3.5% (E); Column 2 35%.
- 4202.91.90.30 Travel, sports and similar bags (No.).
- 4202.91.90.90 Other (under: Other) (No.).
- 4202.92 With outer surface of sheeting of plastics or of textile materials.
- 4202.92.04.00 Beverage bags whose interior incorporates only a flexible plastic container of a kind for storing and dispensing potable beverages through attached flexible tubing (No., kg): General 7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4202.92.08 Other (under: With outer surface of textile materials): General 7%; Special Free (AU,BH,CL,CO,E,IL,JO, KR,MA,NP,OM,P,PA,PE,S,SG); Column 2 40%.
- 4202.92.08.05 Of cotton (369) (under: Other) (No., kg).
- 4202.92.08.07 Of man-made fibers (670) (under: Other) (No., kg).
- 4202.92.08.09 Other (870) (under: Other) (No., kg).
- 4202.92.10.00 Other (under: Insulated food or beverage bags) (No., kg): General 3.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 4202.92.15.00 Of cotton (369) (under: Of vegetable fibers and not of pile or tufted construction) (No., kg): General 6.3%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 4.9% (E); Column 2 40%.
- 4202.92.20.00 Other (870) (under: Of vegetable fibers and not of pile or tufted construction) (No., kg): General 5.7%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 4.4% (E); Column 2 40%.
- 4202.92.31 Of man-made fibers (under: With outer surface of textile materials): General 17.6%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 16.6% (E); Column 2 65%.
- 4202.92.31.20 Backpacks (670) (under: Of man-made fibers) (No., kg).
- 4202.92.31.31 Other (670) (under: Of man-made fibers) (No., kg).
- 4202.92.33 Of paper yarn or of cotton; containing 85 percent or more by weight of silk or silk waste: General 17.6%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 16.6% (E); Column 2 65%.
- 4202.92.33.05 Of paper yarn (under: Of paper yarn or of cotton; containing 85 percent or more by weight of silk or silk waste) (No., kg).
- 4202.92.33.10 Containing 85 percent or more by weight of silk or silk waste (No., kg).
- 4202.92.33.16 Of cotton (369) (under: Of paper yarn or of cotton; containing 85 percent or more by weight of silk or silk waste) (No., kg).
- 4202.92.39.00 Other (870) (under: With outer surface of textile materials) (No., kg): General 17.6%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 16.6% (E); Column 2 65%.
- 4202.92.45.00 Other (under: Travel, sports and similar bags) (No., kg): General 20%; Special Free (A,AU,BH,CL,CO,D,IL, JO,KR,MA,NP,OM,P,PA,PE,R,S, SG) 17.5% (E); Column 2 45%.
- 4202.92.50.00 Musical instrument cases (under: With outer surface of sheeting of plastics or of textile materials) (No.): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 4202.92.60 Of cotton (under: Other): General 6.3%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 4.9% (E); Column 2 40%.
- 4202.92.60.10 Jewelry boxes, and similar containers of a kind normally sold at retail with their contents (No., kg).
- 4202.92.60.91 Other (369) (under: Of cotton) (No., kg).
- 4202.92.91.00 Of man-made fibers (except jewelry boxes of a kind normally sold at retail with their contents) (670) (No., kg): General 17.6%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 16.6% (E); Column 2 45%.
- 4202.92.93 Other (under: With outer surface of textile materials): General 17.6%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 16.6% (E); Column 2 45%.
- 4202.92.93.10 Containing 85 percent or more by weight of silk or silk waste (No., kg).
- 4202.92.93.15 Other, jewelry boxes of a kind normally sold at retail with their contents (No., kg).
- 4202.92.93.36 Other (870) (under: Other) (No., kg).
- 4202.92.94.00 Cases designed to protect and transport compact disks (CD's), CD Rom disks, CD players, cassette players, and/or cassettes (No., kg): General 17.6%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 16.6% (E); Column 2 45%.
- 4202.92.97.00 Other (under: Other) (No., kg): General 17.6%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR, MA,NP,OM,P,PA,PE,S,SG) 16.6% (E); Column 2 45%.
- 4202.99 Other (under: Other).
- 4202.99.10.00 Of plastics (under: Of materials (other than leather, composition leather, sheeting of plastics, textile materials, vulcanized fiber or paperboard) wholly or mainly covered with paper) (No., kg): General 3.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 4202.99.20.00 Not lined with textile fabrics (No., kg): General 4.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
- 4202.99.30.00 Lined with textile fabrics (under: Of wood) (No., kg): General Free; Special none; Column 2 11¢/kg +20%.
- 4202.99.50.00 Other (under: Of materials (other than leather, composition leather, sheeting of plastics, textile materials, vulcanized fiber or paperboard) wholly or mainly covered with paper) (No., kg): General 7.8%; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 110%.
- 4202.99.90.00 Other (under: Other) (No., kg): General 20%; Special Free (A,AU,BH,CL,CO,D,IL, JO,KR,MA,NP,OM,P,PA,PE,R,S,SG) 17.5% (E); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.