HTS Heading 4817

Envelopes, letter cards, plain postcards and correspondence cards, of paper or paperboard; boxes, pouches, wallets and writing compendiums, of paper or paperboard, containing an assortment of paper stationery

All 4 HTS codes under heading 4817 (envelopes, letter cards), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4817

  • 4817 Envelopes, letter cards, plain postcards and correspondence cards, of paper or paperboard; boxes, pouches, wallets and writing compendiums, of paper or paperboard, containing an assortment of paper stationery.
  • 4817.10.00.00 Envelopes (under: Envelopes, letter cards, plain postcards and correspondence cards, of paper or paperboard; boxes, pouches, wallets and writing compendiums, of paper or paperboard, containing an assortment of paper stationery) (thousands): General Free; Special none; Column 2 35%.
  • 4817.20 Letter cards, plain postcards and correspondence cards.
  • 4817.20.20.00 Sheets of writing paper, with border gummed or perforated, with or without inserts, prepared for use as combination sheets and envelopes (kg): General Free; Special none; Column 2 40%.
  • 4817.20.40.00 Other (under: Letter cards, plain postcards and correspondence cards) (kg): General Free; Special none; Column 2 33%.
  • 4817.30.00.00 Boxes, pouches, wallets and writing compendiums, of paper or paperboard, containing an assortment of paper stationery (kg): General Free; Special none; Column 2 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.