HTS Heading 4819

Cartons, boxes, cases, bags and other packing containers, of paper, paperboard, cellulose wadding or webs of cellulose fibers; box files, letter trays and similar articles, of paper or paperboard of a kind used in offices, shops or the like

All 14 HTS codes under heading 4819 (cartons, boxes, cases), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4819

  • 4819 Cartons, boxes, cases, bags and other packing containers, of paper, paperboard, cellulose wadding or webs of cellulose fibers; box files, letter trays and similar articles, of paper or paperboard of a kind used in offices, shops or the like.
  • 4819.10.00 Cartons, boxes and cases, of corrugated paper or paperboard: General Free; Special none; Column 2 35%.
  • 4819.10.00.20 Sanitary food and beverage containers (kg).
  • 4819.10.00.40 Other (under: Cartons, boxes and cases, of corrugated paper or paperboard) (kg).
  • 4819.20.00 Folding cartons, boxes and cases, of non-corrugated paper or paperboard: General Free; Special none; Column 2 35%.
  • 4819.20.00.20 Sanitary food and beverage containers (kg).
  • 4819.20.00.40 Other (under: Folding cartons, boxes and cases, of non-corrugated paper or paperboard) (kg).
  • 4819.30.00 Sacks and bags, having a base of a width of 40 cm or more: General Free; Special none; Column 2 35%.
  • 4819.30.00.20 Shipping sacks and multiwall bags, other than grocers' bags (kg).
  • 4819.30.00.40 Other (under: Sacks and bags, having a base of a width of 40 cm or more) (kg).
  • 4819.40.00 Other sacks and bags, including cones: General Free; Special none; Column 2 35%.
  • 4819.40.00.20 Shipping sacks and multiwall bags, other than grocers' bags (kg).
  • 4819.40.00.40 Other (under: Other sacks and bags, including cones) (kg).
  • 4819.50 Other packing containers, including record sleeves.
  • 4819.50.20.00 Sanitary food and beverage containers (kg): General Free; Special none; Column 2 35%.
  • 4819.50.30.00 Record sleeves (under: Other packing containers, including record sleeves) (kg): General Free; Special none; Column 2 19.3¢/kg.
  • 4819.50.40 Other (under: Other packing containers, including record sleeves): General Free; Special none; Column 2 35%.
  • 4819.50.40.20 Fiber drums, cans, tubes and similar containers (kg).
  • 4819.50.40.40 Rigid boxes and cartons (under: Other) (kg).
  • 4819.50.40.60 Other (under: Other) (kg).
  • 4819.60.00.00 Box files, letter trays, storage boxes and similar articles, of a kind used in offices, shops or the like (kg): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.