HTS Heading 4901
Printed books, brochures, leaflets and similar printed matter, whether or not in single sheets
All 16 HTS codes under heading 4901 (printed books, brochures), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4901
- 4901 Printed books, brochures, leaflets and similar printed matter, whether or not in single sheets.
- 4901.10.00 In single sheets, whether or not folded: General Free; Special none; Column 2 Free.
- 4901.10.00.20 Reproduction proofs (under: In single sheets, whether or not folded) (kg).
- 4901.10.00.40 Other (under: In single sheets, whether or not folded) (kg).
- 4901.91.00 Dictionaries and encyclopedias, and serial installments thereof: General Free; Special none; Column 2 Free.
- 4901.91.00.20 Dictionaries (including thesauruses) (No.).
- 4901.91.00.40 Encyclopedias (under: Dictionaries and encyclopedias, and serial installments thereof) (No.).
- 4901.99.00 Other (under: Other): General Free; Special none; Column 2 Free.
- 4901.99.00.10 Textbooks (under: Other) (No.).
- 4901.99.00.20 Bound newspapers, journals and periodicals provided for in Legal Note 3 to this chapter (No.).
- 4901.99.00.30 Directories (under: Other) (No.).
- 4901.99.00.40 Bibles, testaments, prayer books and other religious books (No.).
- 4901.99.00.50 Technical, scientific and professional books (No.).
- 4901.99.00.60 Valued under $5 each (under: Art and pictorial books) (No.).
- 4901.99.00.65 Valued $5 or more each (under: Art and pictorial books) (No.).
- 4901.99.00.70 Hardbound books (under: Other) (No.).
- 4901.99.00.75 Rack size paperbound books (under: Other) (No.).
- 4901.99.00.91 Containing not more than 4 pages each (excluding covers) (No.).
- 4901.99.00.92 Containing 5 or more pages each, but not more than 48 pages each (excluding covers) (No.).
- 4901.99.00.93 Containing 49 or more pages each (excluding covers) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.