HTS Heading 4907

Unused postage, revenue or similar stamps of current or new issue in the country in which they have, or will have, a recognized face value; stamp-impressed paper; banknotes; check forms; stock, share or bond certificates and similar documents of title

The HTS code under heading 4907 (unused postage), with its duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4907

  • 4907.00.00.00 Unused postage, revenue or similar stamps of current or new issue in the country in which they have, or will have, a recognized face value; stamp-impressed paper; banknotes; check forms; stock, share or bond certificates and similar documents of title (kg): General Free; Special none; Column 2 66¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.